6. Installation
07
6.1 Pole mount
5.3 Point to Multipoint Pairing Step:
e.g.
1 master bridge with 3 slave bridges
1. Switch one unit to A(Master Bridge) and 3 units to B(Slave Bridge);
2. Connect the POE to each unit using the Ethernet cable and plug the POE in;
3. Wait for them to power up, about 2 min;
4. Use the tiny reset button to click through until you get a channel with a letter.
1,2,3,..., A,B,C,...,F, here used C;
5. Then on the other 3 unit do the same. 4 units need to be on the same
channel;
6. Wait for 2-5 minutes to complete the pairing. When the number of the digital
tube is solid and the signal light on the side turns on, it means their pairing is
successful;
7. Finally connect other devices(Router, PC, Switch) and install them to the
target location.