Step 1: Make the battery pack in the standby state and install it in the wall
successively.
Step 2: Disassemble the anode insulating cap of the neighboring batteries one by one, connect
the anodes of up and own neighboring battery packs with the installation connecting line and screw
on the anode insulating cap.
Step 3: According to step 2, connect the cathode of the battery pack.
Step 4: Set the dial-up addresses of all battery modules from top to bottom one by one, which
are 1000, 0100, 1100 and 0010 (the dial-up addresses are set according to the number of battery
modules actually used) respectively; (this step may be skipped if there is no need to access to the
remote monitoring platform).
Step 5: Perform the cascade connection to RS485 communication interface of the battery
module with the RS485 connecting line; lead to the collector of the monitoring platform from the
RS232 interface of the battery module with the address of 1000 with the RS232 connecting line; (this
step may be skipped if there is no need to access to the remote monitoring platform).
Step 6: Draw out two wires from the anode and cathode of a battery pack at the top or in the
middle respectively as the main connecting line of the battery pack in parallel, which are connected
with the switching mode power supply or UPS.
Step 7: Press the RST key of each battery pack for Reset and the whole battery pack with high
capacity enters the working state.