background image

S9501-28SMT

 

 Hardware Installation Guide  |   20

10 

Verifying 

System

 Operation

10.1 

Front Panel LED

Verify basic 

operations

 by checking the system LEDs located on the front panel. When 

operating normally, the PWR, FAN, and STAT LEDs should all display green.

Figure 31. 

LED Condition

Equipment Status

PWR 

OFF

No power or in shutdown mode.

Solid Green

System power good & BMC is present & BMC power good.

Blinking Green

System power good & BMC is present but BMC power fail.

Solid Amber

System power good & BMC is absent.

 

Blinking Amber

System power fail.

FAN

OFF

No fan modules present.

Solid Green

All fan modules work well.

Blinking Green

Reserved.

Solid 

Amber

Reserved.

Blinking 

Amber

One or more FAN module(s) fail.

STAT 

OFF

System (x86 & BMC) no boot.

Solid Green

System boot complete.

NOTE: 

Need NOS to activate this feature.

Blinking Green

System is booting.

Solid 

Amber

Reserved.

Blinking 

Amber

Reserved.

SYNC

OFF

System timing synchronization is disabled or in free-run mode.

 

NOTE: 

Need NOS to 

activate

 this feature.

Solid Green

System timing core(1588 and SyncE) is synchronized to external 

timing source (ex: GNSS, 1PPS, PTP, BITS, etc).

NOTE: 

Need NOS to 

activate

 this feature.

Blinking Green

System is synchronized in SyncE mode.

 

NOTE: 

Need NOS to 

activate

 this feature.

Содержание S9501-28SMT

Страница 1: ...S9501 28SMT Disaggregated Cell Site Gateway Hardware Installation Guide R1 0...

Страница 2: ...our System 7 4 1 S9501 28SMT DC Version Overview 7 4 2 S9501 28SMT AC Version Overview 8 4 3 DC Version PSU Overview 9 4 4 AC Version PSU Overview 10 4 5 Fan Overview 10 4 6 Port Overview 11 5 Rack Mo...

Страница 3: ...e USB Extender Cable 23 12 2 Connecting a Cable to the ToD Interface 23 12 3 Connecting a Cable to the BITS Interface 23 12 4 Connecting the GNSS Interface 23 12 5 Connecting the 1PPS Interface 24 12...

Страница 4: ...ted open network infrastructure to lower costs and rapidly scale existing services for edge computing mobile backhaul and broadband access applications The S9501 28SMT is future proofed with a powerfu...

Страница 5: ...2 Insula on Wire Lead Ground Wire size 6 AWG 0 5 0 02 12 7 0 5 mm 14 AWG wire with ring terminal for DC power supply 6 AWG wire for grounding Wire stripping tools for stripping 6 AWG copper wire Conso...

Страница 6: ...r 19 rack width 4 Post Racks 33 For 22 33 rack depth Space Clearance The S9501 28SMT chassis width is 17 32 inches 44cm and shipped with a rack mount brackets suitable for 19 inch 48 3cm wide racks Th...

Страница 7: ...8V DC 8 4 ampere maximum or AC version 100 240V 3 1 5 ampere Installation spacing and weight load requirement S9501 28SMT is 1RU 1 75 4 5cm in height 19 48 3cm in width and 16 40 6cm in depth without...

Страница 8: ...3 Rack Mount Bracket 1 98 x 1 69 x 0 79 19 width rack 50 4 x 43 x 20mm 2 pcs 0 15lbs 67 2g 2 pcs 0 07lbs 33 6g pcs 4 Screw Kit for Rack Mount Bracket 8 x Screws M4 0 L6 5mm 8 sets 0 01lbs 6 5g set 5 A...

Страница 9: ...ound lug 0 022lbs 10g Rack mount bracket 0 07lbs 33 6g Adjustable mounting rail 0 89lbs 405g USB extension cord 0 021lbs 9 7g Screw kit for ground lug 0 008lbs 3 8g per set Screw kit for rack mount br...

Страница 10: ...28SMT Hardware Installation Guide 7 4 Identifying Your System 4 1 S9501 28SMT DC Version Overview SPEC LABEL CUS BAR CODE SPEC LABEL CUS BAR CODE D 11 89 302 mm W 17 32 440 mm H 1 713 43 5 mm 1RU Fig...

Страница 11: ...pe A USB 16 x 2 5G SFP 2x10G SFP MACsec TOD Console Grounding Lug Figure 6 4 2 S9501 28SMT AC Version Overview Figure 7 4 x 1G RJ45 SPEC LABEL CUS BAR CODE SPEC LABEL CUS BAR CODE D 11 89 302 mm W 17...

Страница 12: ...placeable unit FRU Figure 9 AIR FLOW 50 5 2 6 0 25 Handle Color Black EMI Shielding Gaskets 3x SPEC LABEL CUS BAR CODE 39 85 40 2 198 5 Latch Color Blue Figure 10 3 x 4028 Fan Modules 1PPS 10MHz AC PS...

Страница 13: ...re Installation Guide 10 4 4 AC Version PSU Overview 1 1 hot swappable power supply unit PSU field replaceable unit FRU Figure 11 Figure 12 4 5 Fan Overview 2 1 hot swappable fan field replaceable uni...

Страница 14: ...iew Port ID Form Factor Maximum Support Distance Support Speed 0 3 RJ45 238 01ft 100m 1GE 100M 4 19 SFP 24 85mi 40km 2 5GE 1GE 100M 20 25 SFP 24 85mi 40km 10GE 2 5GE 1GE 26 27 SFP 24 85mi 40km 10GE 2...

Страница 15: ...ent in position on the rack while the other secures it in place 1 Secure the rack mount brackets onto the router Align the rack mount brackets with the holes provided on the both sides of the case and...

Страница 16: ...into the fan bay and gently push until it is flush with the case 5 Secure the captive screw on the fan module to lock the fan in place The fan modules are hot swappable field replaceable units FRUs wh...

Страница 17: ...g as the remaining second PSU is installed and in operation The PSUs comes pre installed and the following are instructions on how to install a new PSU DC AC Caution Shock hazard For safety please dis...

Страница 18: ...bay ensuring the PSU s power connector is in the correct position 4 Carefully slide the new PSU into the power bay and gently push until it is flush with the case 5 An audible click will be heard when...

Страница 19: ...ion from a size 6 AWG grounding wire not provided within the package contents leaving 0 5 0 02 12 7mm 0 5mm of exposed grounding wire 3 Insert the exposed grounding wire all the way into the hole of t...

Страница 20: ...1 Star Washers 4 pcs Loca on 2 Ground Screw 2 pcs Figure 27 5 Locate the designated location for securing the grounding lug which is located on the side of the router 6 Using 2 M4 screws and 4 washers...

Страница 21: ...em power consumption is 200 watt The minimum power distribution unit fuse requirement is 15 ampere based on the lowest voltage of 42 6 volts 2 Attach the power cable Locate the DC power screw type ter...

Страница 22: ...system power consumption is 200 watts with an input voltage of 100 240V and 3 amperes 2 Attach the power cable Plug the power cord into the AC PSU and secure it tightly 3 Verify that the power supply...

Страница 23: ...System power fail FAN OFF No fan modules present Solid Green All fan modules work well Blinking Green Reserved Solid Amber Reserved Blinking Amber One or more FAN module s fail STAT OFF System x86 BMC...

Страница 24: ...in learning state Self survey is not completed NOTE Need NOS to activate this feature Blinking Amber GNSS antenna is short to ground NOTE Need NOS to activate this feature 10 2 PSU FRU LED LED Condit...

Страница 25: ...lug a RJ45 serial cable into the console port and connect the other end to the computer Cable types may vary depending on the model 2 Check for serial control availability Disable any serial communica...

Страница 26: ...front panel of the router 2 Connect the other end of the cable to the BITS patch or demarcation panel 3 Below is the pinout for the BITS port BITS_T1_RTIP_CONN BR1 1RX 1RX 1TX B4 B5 1TX B7 B8 BR2 BR3...

Страница 27: ...nize the cables For easier management label each fiber optic cable and record its respective connection Maintain a clear line of sight to the port LEDs by routing the cables away from the LEDs Caution...

Страница 28: ...ment damage may result Caution Use of controls or adjustments or performance of procedures other than those specified herein may result in hazardous radiation exposure Warning Do not use optical instr...

Страница 29: ...www ufispace com...

Отзывы: