AF-5, AF-5U Quick Start Guide
https://dl.ubnt.com/qsg/AF-5_AF-5U/AF-5_AF-5U_EN.html[2/17/2020 12:42:26 PM]
(42-58VDC)
Mounting
Pole Mount Kit (Included)
Wind Loading
863 N @ 200 km/hr
(194 lbf @ 125 mph)
Wind Survivability
200 km/hr (125 mph)
Operating Temperature
-40 to 55° C (-40 to 131° F)
Certifications
CE, FCC, IC
Networking Interface
Data Port
(1) 10/100/1000 Ethernet Port
Management Port
(1) 10/100 Ethernet Port
Safety Notices
1. Read, follow, and keep these instructions.
2. Heed all warnings.
3. Only use attachments/accessories specified by the manufacturer.
WARNING:
Do not use this product in location that can be submerged by water.
WARNING:
Avoid using this product during an electrical storm. There may be a remote risk of
electric shock from lightning.
Electrical Safety Information
1. Compliance is required with respect to voltage, frequency, and current requirements indicated on the
manufacturer’s label. Connection to a different power source than those specified may result in
improper operation, damage to the equipment or pose a fire hazard if the limitations are not followed.
2. There are no operator serviceable parts inside this equipment. Service should be provided only by a
qualified service technician.
3. This equipment is provided with a detachable power cord which has an integral safety ground wire
intended for connection to a grounded safety outlet.
a. Do not substitute the power cord with one that is not the provided approved type. Never use an
adapter plug to connect to a 2-wire outlet as this will defeat the continuity of the grounding wire.
b. The equipment requires the use of the ground wire as a part of the safety certification, modification
or misuse can provide a shock hazard that can result in serious injury or death.
c. Contact a qualified electrician or the manufacturer if there are questions about the installation prior
to connecting the equipment.
d. Protective earthing is provided by Listed AC adapter. Building installation shall provide appropriate
short-circuit backup protection.
e. Protective bonding must be installed in accordance with local national wiring rules and regulations.
Содержание airFiber AF-5
Страница 13: ...AF 5 AF 5U Quick Start Guide https dl ubnt com qsg AF 5_AF 5U AF 5_AF 5U_EN html 2 17 2020 12 42 26 PM 5...
Страница 14: ...AF 5 AF 5U Quick Start Guide https dl ubnt com qsg AF 5_AF 5U AF 5_AF 5U_EN html 2 17 2020 12 42 26 PM 6 7...
Страница 16: ...AF 5 AF 5U Quick Start Guide https dl ubnt com qsg AF 5_AF 5U AF 5_AF 5U_EN html 2 17 2020 12 42 26 PM 2...
Страница 17: ...AF 5 AF 5U Quick Start Guide https dl ubnt com qsg AF 5_AF 5U AF 5_AF 5U_EN html 2 17 2020 12 42 26 PM 3...
Страница 18: ...AF 5 AF 5U Quick Start Guide https dl ubnt com qsg AF 5_AF 5U AF 5_AF 5U_EN html 2 17 2020 12 42 26 PM 4...