Page
20
Step 14
14. From the front of the Shelter, slide five Main Roof Panels (K) in the grooves of the Roof Holder
Bars all the way to the end (1 per row).
CAUTION:
One side of each Roof Panel is treated to provide UV protection. Make sure that the side with UV
protection is facing outward. This step is very important – if the roof is not assembled as per the
instructions shown, it will not be covered by the warranty.
NOTE:
The panels are covered with a plastic film to identify which side is treated with UV protection. Once this
film is removed, it is not possible to tell which side protects against UV rays. Therefore, it is
recommended to remove the film only once the panels have been installed, one at a time.
X 4
K
K
J2
J1
J
K
K
K
G2
Содержание 72255159
Страница 14: ...Page 14 Step 8 8 Attach the Rail E to the Rail D with Screws T X 5 D D T T E E ...
Страница 18: ...Page 18 Step 12 12 Attach the Back Roof Holder Bar H with Screws V X 3 V H H V J J1 J2 ...
Страница 19: ...Page 19 Step 13 13 Attach the Side Caps M M1 with Screws V C C1 V M M1 H V M M1 C C1 J J1 J J1 ...
Страница 37: ...Page 37 Étape 8 8 Installez les rail E sur les rails D à l aide des vis T X 5 D D T T E E ...