Page
13
Step 7
7.1. Insert the Side Roof Panels (K1a & K1b) between the Rails (C & C1) and the Roof Holder Bars (J
& J1) which form a triangle on the sides of the shelter.
7.2. Insert the Side Roof Panels (K2a & K2b) between the Rails (C & C1) and the Roof Holder Bars (J
& J1) which form a triangle on the sides of the shelter, until they reach the Side Roof Panels (K1a &
K1b)
CAUTION:
One side of each Roof Panel is treated to provide UV protection. Make sure that the side
treated with UV protection is facing outward. This step is very important – if the roof is not
assembled as per the instructions shown, it will not be covered by the warranty.
NOTE:
The panels are covered with a plastic film to identify which side has UV protection. Once this
film is removed, it is not possible to tell which side protects against UV rays. Therefore, it is
recommended to remove the film only once the panels have been installed, one at a time.
C
C
J1
J
C1
J
K1a
K1a
K2a
K2b
K1b
Содержание 72255159
Страница 14: ...Page 14 Step 8 8 Attach the Rail E to the Rail D with Screws T X 5 D D T T E E ...
Страница 18: ...Page 18 Step 12 12 Attach the Back Roof Holder Bar H with Screws V X 3 V H H V J J1 J2 ...
Страница 19: ...Page 19 Step 13 13 Attach the Side Caps M M1 with Screws V C C1 V M M1 H V M M1 C C1 J J1 J J1 ...
Страница 37: ...Page 37 Étape 8 8 Installez les rail E sur les rails D à l aide des vis T X 5 D D T T E E ...