background image

84

Beckett AFG 

Burner

SECTION  XVI:  REP

A

IR  P

A

R

T

S (continued)

Содержание V8H3

Страница 1: ...i o b o t s r i a p e r r o e c i v r e s r o F g n i t a R n o n w o h s s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e l i o b n o n o i t a m r o f n i r e l...

Страница 2: ...cordance with National State and Local Plumbing Heating and Electrical Codes and the regulations of the serving utilities These Codes and Regulations may differ from this instruction manual Authoritie...

Страница 3: ...r to see that all controls are correctly installed and are operating properly when installation is complete including verifying that the limit sensor is fully installed seated in bottom of Well Failur...

Страница 4: ...ns of this manual for details This boiler must be properly vented and connected to an approved vent system in good condition DO NOT operate boiler with the absence of an approved vent system 7KLV ERLO...

Страница 5: ...0 833 81 4 8 8 x 12 15 V8H8W 2 35 329 275 239 82 0 8 8 x 12 15 V8H9S 2 60 364 298 224 933 82 3 9 8 x 12 15 V8H9W 2 60 364 299 260 82 3 9 8 x 12 15 RLOHU 0RGHO 6XI 6 6WHDP DWHU SECTION I PRODUCT DESCRI...

Страница 6: ...6 Figure 1A V8H3 thru V8H9 Water Boiler without Tankless Heater SECTION I PRODUCT DESCRIPTION SPECIFICATION AND DIMENSIONAL DATA continued...

Страница 7: ...7 Figure 1B V8H3 thru V8H9 Water Boiler with Front Tankless Heater SECTION I PRODUCT DESCRIPTION SPECIFICATION AND DIMENSIONAL DATA continued...

Страница 8: ...8 Figure 1C V8H3 thru V8H9 Water Boiler with Rear Tankless Heater SECTION I PRODUCT DESCRIPTION SPECIFICATION AND DIMENSIONAL DATA continued...

Страница 9: ...9 Figure 1D V8H3 thru V8H9 Steam Boiler with or without Tankless Heater SECTION I PRODUCT DESCRIPTION SPECIFICATION AND DIMENSIONAL DATA continued...

Страница 10: ...ERLOHU 3529 6 59 5 1 RI DW OHDVW FOHDUDQFH IURP IURQW MDFNHW SDQHO IRU VHUYLFLQJ DQG UHPRYDO RI IURQW WDQNOHVV KHDWHU LQFUHDVH WR IRU KHDWHU I ERLOHU LV HTXLSSHG ZLWK D UHDU WDQNOHVV KHDWHU SURYLGH D...

Страница 11: ...HWDLOV or E 2XWGRRU DLU PD EH SURYLGHG ZLWK WKH XVH RI WZR SHUPDQHQW RSHQLQJV ZKLFK FRPPXQLFDWH GLUHFWO RU E GXFW ZLWK WKH RXWGRRUV RU VSDFHV FUDZO RU DWWLF IUHHO FRPPXQLFDWLQJ ZLWK WKH RXWGRRUV RFDWH...

Страница 12: ...N WATER FROM BOILER Remove gauge YDOYH DQG SOXJV IURP WKRVH WDSSLQJV WR EH XVHG HDYH RWKHU WDSSLQJV SOXJJHG RU EXVKHG DFFRUGLQJ WR LJXUH E INSPECT JOINTS BETWEEN SECTIONS All MRLQWV DUH IDFWRU VHDOHG...

Страница 13: ...L4006A Operating Control N A N A L7224 Boiler Control G 1 Bushed to for Drain Valve Optional Return Return H 1 Return Plugged J 1 Surface Blowoff Plugged Flush Plug K 2 Front Supply 3 thru 9 Section...

Страница 14: ...hinge pin and set door aside Remove WZR ORQJ FDS VFUHZV VHFXULQJ WKH KLQJH EUDFNHW WR WKH ERLOHU VHFWLRQ QVWDOO MDFNHW UHDU SDQHO VXSSRUW EUDFNHW 6HH LJXUH WHP OLJQ EUDFNHW ZLWK WZR WDSSHG KROHV LQ UH...

Страница 15: ...K 1R KHFN WKH EXUQHU VZLQJ GRRU LQVXODWLRQ DQG URSH JDVNHW IRU GDPDJH DQG DGKHVLRQ I GDPDJHG UHSODFH LQVXODWLRQ RU JDVNHW I LQVXODWLRQ RU JDVNHW LV ORRVH UHDWWDFK WR VZLQJ GRRU ZLWK 579 RU VLOLFRQH FD...

Страница 16: ...RU WKH SURSHU HOHFWURGH VHWWLQJ 5HDGMXVW HOHFWURGH VHWWLQJ WR WKH SURSHU GLPHQVLRQV LI QHFHVVDU J 5HLQVWDOO HFNHWW 0 9 RU 0 HDG K 5HLQVWDOO QR OH OLQH HOHFWURGH DVVHPEO L RQQHFW FRSSHU FRQQHFWRU WXEH...

Страница 17: ...KHV WKH LQSXW RLO QR OH LQVWDOOHG LQ WKH EXUQHU 9HULI WKDW WKH LQVWDOOHG SRVLWLRQLQJ EDU PDWFKHV WKH LQSXW RLO QR OH LQVWDOOHG LQ WKH EXUQHU UHIHU WR 7DEOH DW WKH UHDU RI WKLV manual Q WKH FDVH RI WKH...

Страница 18: ...7XUQ WKH DGMXVWLQJ FUHZ FORFNZLVH WR PRYH WKH FRPEXVWLRQ KHDG IRUZDUG LQFUHDVLQJ WKH GLPHQVLRQ FRXQWHUFORFNZLVH ZLOO SXOO WKH KHDG EDFN GHFUHDVLQJ WKH GLPHQVLRQ 7R ORFN LQ SODFH UVW WLJKWHQ WKH WKXPE...

Страница 19: ...VFUHZ XQWLO WKH LQGH PDUNHU LV DOLJQHG ZLWK WKH FRUUHFW LQGH QXPEHU LQ WKH XUQHU 6HWXS KDUW 7DEOH DW WKH UHDU RI WKLV PDQXDO LLL 5HWLJKWHQ WKH UHWDLQLQJ QXW 02 WKUX 6HFWLRQ HUR DQG IRXU DUH VFDOH LQGL...

Страница 20: ...ROW VORWV DUH SDUDOOHO WR WKH ERLOHU IURQW H 3ODFH D FLUFXODU DQJH JDVNHW LQ WKH DQJH JURRYH RQ WKH FLUFXODWRU DQG PRXQW WKH FLUFXODWRU RQ WKH DQJH 1RWH WKDW WKLV LV WKH UHWXUQ SLSLQJ DQG WKH RZ DUURZ...

Страница 21: ...GUDLQ YDOYH LQWR WKH 137 WDSSLQJ ORFDWHG LQ WKH ORZHU ULJKW FRUQHU RI WKH IURQW VHFWLRQ 7LJKWHQ ZLWK ZUHQFK NOTICE Lower rear section Tapping H is used for standard condensate return on steam boilers...

Страница 22: ...PRUH GHWDLOV E 5HIHU WR 3DUDJUDSK 5 IRU GHWDLOV RQ XVH RI EXUQHU GLVFRQQHFW MXQFWLRQ ER SURYLGHG ZLWK DOO NQRFNGRZQ ERLOHU EXLOGV P INSTALL TRIM AND CONTROLS WITH CARLIN BURNERS Water boilers Only VH...

Страница 23: ...DTXDVWDW FRQWURO WR WKH 5 RQWURO HQWHU V 5 WHUPLQDOV 0DNH WKH ZLULQJ FRQQHFWLRQV DV VKRZQ LQ DSSURSULDWH ZLULQJ GLDJUDP UHIHU WR LJXUH 23A 23B 24A or 24B Note DO NOT UHPRYH 7 7 MXPSHU XQOHVV ZLULQJ GL...

Страница 24: ...2 RRVHQ DQG UHPRYH OHIW VLGH KLQJH KDUGZDUH OJ KH KHDG DQJH EROW Step 3 7KH GXHO SLYRW DUWLFXODWHG KLQJH DOORZV ULJKW VLGH RI GRRU WR EH SXOOHG RXWZDUG DQG URWDWHG WR WKH OHIW DOO LQ RQH PRWLRQ 7R GR...

Страница 25: ...G DQJH EROW VHFRQG Apply DGGLWLRQDO SUHVVXUH ZKLOH KDQG WLJKWHQLQJ WKH KDUGZDUH DV IDU DV SRVVLEOH WKHQ UHOHDVH WKH pressure Figure 13A Partial Front View Burner Swing Door Mounted to Boiler Fully Clo...

Страница 26: ...26 Figure 13B Top View Burner Swing Door Mounted to Cast Iron Block Assembly Jacket Removed for Clarity SECTION IV PACKAGED BOILER ASSEMBLY continued...

Страница 27: ...QFOXGHG LQ WULP EDJ 6DIHW RU 5HOLHI 9DOYH PXVW EH LQVWDOOHG ZLWK VSLQGOH LQ YHUWLFDO SRVLWLRQ 3LSH GLVFKDUJH DV VKRZQ LQ LJXUHV DQG QVWDOODWLRQ RI WKH VDIHW RU UHOLHI YDOYH PXVW EH FRQVLVWHQW ZLWK 16...

Страница 28: ...P LV SLSHG LQ SDUDOOHO ZLWK WKH KHDWLQJ ERLOHU XVLQJ DSSURSULDWH YDOYHV WR SUHYHQW WKH FKLOOHG PHGLXP IURP HQWHULQJ WKH ERLOHU 6HH LJXUH OVR FRQVXOW 5HVLGHQWLDO GURQLF HDWLQJ QVWDOODWLRQ DQG HVLJQ 5 X...

Страница 29: ...UVW EH LVRODWHG WR DYRLG D SUHVVXUH ORVV GXH WR WKH HVFDSH RI DLU WUDSSHG PXVW UVW EH UHPRYHG IURP WKH ERLOHU 7R SHUIRUP D ORQJ WHUP SUHVVXUH WHVW LQFOXGLQJ WKH ERLOHU WUDSSHG DLU PXVW UVW EH UHPRYHG...

Страница 30: ...30 Figure 15A Recommended Water Piping for Circulator Zoned Heating System Supply Side Circulators SECTION V WATER BOILER PIPING AND TRIM continued...

Страница 31: ...31 Figure 15B Recommended Water Piping for Zone Valve Zoned Heating System Supply Side Circulator SECTION V WATER BOILER PIPING AND TRIM continued...

Страница 32: ...ly pipe boiler may result in improper operation and damage to boiler or structure DO NOT increase steam boiler input above the ratings DO NOT use softened water in steam boilers Accelerated boiler cor...

Страница 33: ...ler Piping for Gravity Return Steam Boiler SECTION VI STEAM BOILER PIPING AND TRIM continued NOTICE DLOXUH WR SLSH ERLOHU DV VSHFL HG LQ WKLV PDQXDO PD UHVXOW LQ H FHVVLYH V VWHP QRLVH ZDWHU OLQH XFWX...

Страница 34: ...ZDWHU ZKLOH VHHNLQJ D ZDWHU WHPSHUDWXUH LJKHU WHPSHUDWXUH KRW ZDWHU UHTXLUHG E GLVKZDVKHUV DQG DXWRPDWLF ZDVKHUV LV SRVVLEOH E SLSLQJ WKH KRW ZDWHU IURP WKH KHDWHU SULRU WR HQWHULQJ WKH PL LQJ YDOYH 7...

Страница 35: ...ter Steam Water V8H3 V1 2 2 75 3 3 9 4 7 V8H4 V1 2 3 3 25 4 7 5 6 V8H5 V1 2 3 25 3 5 5 6 6 4 V8H6 V1 2 3 75 3 75 7 2 7 2 V8H7 V1 2 3 75 4 7 2 8 V8H8 V1 2 4 4 5 8 9 8 V8H9 V1 2 4 4 5 8 9 8 Boiler Model...

Страница 36: ...with V8H Steam Boiler B CONNECT INDIRECT DOMESTIC WATER HEATER PIPING DV VKRZQ LQ LJXUH 5HIHU WR QGLUHFW DWHU HDWHU QVWDOODWLRQ 2SHUDWLQJ DQG 6HUYLFH QVWUXFWLRQV IRU DGGLWLRQDO information SECTION VI...

Страница 37: ...U VWDFN WHPSHUDWXUH DQG OHVV GLOXWLRQ DLU FDQ LQ VRPH FDVHV FRQWULEXWH WR WKH FRQGHQVLQJ RI VPDOO DPRXQWV RI ZDWHU YDSRU LQ WKH FKLPQH 6XFK FRQGHQVDWLRQ ZKHQ LW RFFXUV FDQ FDXVH FKLPQH GHWHULRUDWLRQ Q...

Страница 38: ...38 Figure 19 Proper and Improper Locations of Draft Regulator LJXUH 5HFRPPHQGHG 9HQW 3LSH UUDQJHPHQW DQG KLPQH 5HTXLUHPHQWV SECTION VIII VENTING AND AIR INTAKE PIPING continued...

Страница 39: ...WHQ ZLWK D VFUHZ DQG QXW LQ FROODU WDEV 7R HQVXUH SURSHU RSHUDWLRQ WKH JDWH PXVW EH OHYHO DFURVV WKH SLYRW SRLQW DQG SOXPE 5HIHU WR YDFXXP UHOLHI YDOYH PDQXIDFWXUHU V LQVWUXFWLRQV QVWDOO UHPDLQGHU RI...

Страница 40: ...H DZD IURP WKHUPRVWDW VR WKHUH ZLOO EH IUHH PRYHPHQW RI URRP DLU DURXQG WKLV FRQWURO HDW QWLFLSDWRU LQ 7KHUPRVWDW VKRXOG EH VHW WR PDWFK WKH UHTXLUHPHQWV RI WKH FRQWURO WR ZKLFK LW LV FRQQHFWHG 6HH LJ...

Страница 41: ...ic Wiring Diagram Water Boiler without Tankless Heater Cold Start Control All Burner Options SECTION IX ELECTRICAL continued SEE FIGURE 25 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIATE BURNER AND OIL PR...

Страница 42: ...ring Diagram Water Boiler with Front or Rear Tankless Heater Warm Start Control All Burner Options SECTION IX ELECTRICAL continued SEE FIGURE 25 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIATE BURNER AND...

Страница 43: ...Schematic Wiring Diagram Steam Boiler Hydrolevel CG450 Probe LWCO All Burner Options SECTION IX ELECTRICAL continued SEE FIGURE 25 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIATE BURNER AND OIL PRIMARY CO...

Страница 44: ...lin Burners SECTION IX ELECTRICAL continued McDonnell Miller PS 801 Terminals May Be Lettered or Numbered as Follows Wire Color Numbered Terminals Lettered Terminals RD 5 B BK 1 H WH 2 N Jumper 1 3 H...

Страница 45: ...Burners SECTION IX ELECTRICAL continued McDonnell Miller PS 801 Terminals May Be Lettered or Numbered as Follows Wire Color Numbered Terminals Lettered Terminals RD 5 B BK 1 H WH 2 N Jumper 1 3 H C SE...

Страница 46: ...ematic Wiring Diagram Steam Boiler McDonnell Miller 67 Float LWCO Beckett Carlin Burners SECTION IX ELECTRICAL continued SEE FIGURE 25 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIATE BURNER AND OIL PRIMAR...

Страница 47: ...Schematic Wiring Diagram Steam Boiler McDonnell Miller 67 Float LWCO Riello Burners SECTION IX ELECTRICAL continued SEE FIGURE 25 FOR SCHEMATIC WIRING DIAGRAM OF APPROPRIATE BURNER AND OIL PRIMARY CO...

Страница 48: ...48 SECTION IX ELECTRICAL continued Figure 25 Schematic Wiring Diagrams For All Burner Options w Various Oil Primary Controls...

Страница 49: ...PDOOHU WKDQ LURQ SLSH RU 2 FRSSHU WXELQJ RSSHU WXELQJ VKDOO KDYH D PLQLPXP ZDOO WKLFNQHVV WARNING Under no circumstances can copper with sweat style connectors be used NOTICE 6RPH MXULVGLFWLRQV UHTXLU...

Страница 50: ...DQG LQFK 2 WXELQJ IRU ERWK VXFWLRQ DQG UHWXUQ OLQHV 5HIHU WR LJXUH Lift H See Fig 25 Maximum Length of Tubing H R See Figure 27 3 8 OD Tubing 3 GPH 1 2 OD Tubing 3 GPH 0 93 100 2 85 100 4 77 100 6 69...

Страница 51: ...QJ DQG HOHFWULFDO V VWHP DUH LQVWDOOHG SURSHUO 5HIHU WR QVWDOODWLRQ QVWUXFWLRQV FRQWDLQHG LQ WKLV PDQXDO RQ UP DOO HOHFWULFDO ZDWHU DQG RLO VXSSOLHV DUH WXUQHG RII DW WKH VRXUFH DQG WKDW WKH YHQW LV F...

Страница 52: ...PS YHQW WWLQJ DQG SURYLGH D SDQ WR FDWFK WKH RLO H 23 1 0 2 6 59 7 21 3257 29 5 RQ EXUQHU VZLQJ GRRU 3 Carlin Elite EZ Burners D QVSHFW DUOLQ KHDG VHWWLQJ RQ OHIW VLGH RI EXUQHU WR HQVXUH WKDW WKH SUR...

Страница 53: ...XVH D KHDG SRVLWLRQLQJ EDU WR WKH KHDG VHWWLQJ EDVHG RQ QR OH VL H 7R DGMXVW WKLV VHWWLQJ EDU PXVW EH FKDQJHG WR WKH QH W ODUJHU RU VPDOOHU EDU DYDLODEOH 5HIHU WR 6HFWLRQ 3DUDJUDSK E for details Carli...

Страница 54: ...54 Figure 29A L1 and V1 Head Electrode Positioning and Gun Setting Beckett AFG SECTION XI SYSTEM START UP continued...

Страница 55: ...HUDWLRQ DERXW WR WLPHV ZLOO rid oil line of this air 12 217 18 6 72 5 3 UHSHDW 3DUDJUDSK 1R DERYH I WKLV GRHV QRW VWRS WKH GULSSLQJ UHPRYH FXW RII YDOYH DQG VHDW DQG ZLSH ERWK ZLWK D FOHDQ FORWK XQWLO...

Страница 56: ...MXPSHU XQOHVV ZLULQJ GLDJUDP LQGLFDWHV D GLUHFW FRQQHFWLRQ IURP WKHUPRVWDW DQG RU WDQNOHVV KHDWHU DTXDVWDW FRQWURO WR WKH RLO EXUQHU SULPDU FRQWURO V 7 7 WHUPLQDOV 5HIHU WR DSSURSULDWH ZLULQJ GLDJUDP...

Страница 57: ...FDG FHOO LV good I VDIHW VZLWFK VKXWV GRZQ EXUQHU DQG UHVLVWDQFH LV DERYH 2 06 RSHQ OLQH VZLWFK WR ERLOHU FFHVV FDG FHOO XQGHU LJQLWRU FOHDQ IDFH RI FDG FHOO DQG VHH WKDW FHOO LV VHFXUHO LQ VRFNHW VH...

Страница 58: ...HGV KLJK OLPLW VHWWLQJ 7KH EXUQHU VKRXOG VKXW GRZQ DQG FLUFXODWRUV FRQWLQXH running F OORZ WKH WHPSHUDWXUH WR GURS EHORZ FRQWURO VHWWLQJ 7KH EXUQHU PXVW UHVWDUW G RLOHU LQVWDOODWLRQ LV QRW FRQVLGHUHG...

Страница 59: ...RW VHH DPH ZLWKLQ DSSUR LPDWHO VHFRQGV SULPDU FRQWURO ZLOO VKXW GRZQ WKH EXUQHU DQG HQWHU LQWR D ORFNRXW PRGH ORFNRXW LV UHVHW E SUHVVLQJ WKH UHVHW EXWWRQ ORFDWHG RQ WKH SULPDU FRQWURO I WKH DPH LV OR...

Страница 60: ...8S RZQ and I NH V PD EH XVHG WR YLHZ ERLOHU RSHUDWLQJ VWDWXV LJXUH 4 Viewing the Operating Mode Options Q RSHUDWLQJ PRGH WKH XVHU PD YLHZ EXW QRW FKDQJH ERLOHU RSHUDWLQJ VWDWXV VHWWLQJV DQG WURXEOHVKR...

Страница 61: ...HU WHPSHUDWXUH LV OHVV WKDQ 7KLV IHDWXUH KHOSV VDYH HQHUJ E VDWLVI LQJ KRPH KHDWLQJ QHHGV ZLWK UHVLGXDO ERLOHU KHDW UDWKHU WKDQ F FOLQJ WKH ERLOHU 7KH LUFXODWRU 3UH SXUJH WLPH KDV D IDFWRU VHWWLQJ RI...

Страница 62: ...H ERLOHU FRQWURO SURYLGHV D 5 LQSXW WHUPLQDO IRU WKH TXDVWDW DQG RXWSXW WHUPLQDO IRU WKH LUFXODWRU KHQ WKHUH LV D FDOO IRU KHDW WKH 6 VWHP LUFXODWRU LV IRUFHG RII WKH LUFXODWRU WHUPLQDO LV HQHUJL HG D...

Страница 63: ...WHG E VHQVLQJ D YROWDJH RQ WKH 5 WHUPLQDO 7KH DUP 6WDUW RLOHU RQWURO GRHV QRW KDYH WKH WHUQDO RZ LPLW 2SWLRQ 5HIHU WR 7DEOH B STEAM BOILERS SEQUENCE OF OPERATION 8SRQ D WKHUPRVWDW FDOO IRU KHDW ZKHQ S...

Страница 64: ...irator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection 7DNH VWHSV WR DVVXUH DGHTXDWH YHQWLODWLRQ DVK DOO H SRVHG ERG DUHDV JHQWO with soap and water after contact DVK ZRUN FORWKHV VHSD...

Страница 65: ...r foreign matter L SSO D PRGHUDWH DPRXQW RI JRRG TXDOLW SLSH GRSH WR WKH SLSH WKUHDGV RQ WKH SUREH OHDYLQJ WKH WZR HQG WKUHDGV EDUH DO NOT XVH 37 7H RQ WDSH M 6FUHZ WKH SUREH LQWR WKH ERLOHU WDSSLQJ N...

Страница 66: ...RZQ LQ LJXUH DQG SURFHHG DV IROORZV L RQQHFW KRVHV IURP GUDLQ YDOYHV WR RRU GUDLQ ORVH JDWH YDOYH LQ DUWIRUG RRS DQG RSHQ GUDLQ YDOYH LQ UHWXUQ PDLQ LOO ERLOHU WR QRUPDO ZDWHU OHYHO WXUQ RQ RLO EXUQHU...

Страница 67: ...OHU DV WKRURXJKO DV SRVVLEOH XVLQJ D KLJK SUHVVXUH ZDWHU VWUHDP LLL 5H OO WKH V VWHP ZLWK IUHVK ZDWHU F GG DSSURSULDWH ERLOHU ZDWHU WUHDWPHQW FRPSRXQGV DV UHFRPPHQGHG E RXU TXDOL HG ZDWHU WUHDWPHQW FR...

Страница 68: ...RLOHU WR WRS RI ZDWHU FROXPQ DQG OHDYH LW WKDW ZD XQWLO IDOO ZKHQ ZDWHU VKRXOG EH GUDLQHG DJDLQ WR SURSHU OHYHO I DW WKLV WLPH ERLOHU ZDWHU LV GLUW GUDLQ ZDWHU XVK RXW ERLOHU DQG UH OO ZLWK FOHDQ ZDWH...

Страница 69: ...D AFTER CLEANING UHPRYH SURWHFWLYH FORWK RU SODVWLF ZLWK GHEULV DQG YDFXXP DV QHFHVVDU EXW EH FDUHIXO QRW WR GDPDJH EODQNHW QVSHFW WDUJHW ZDOO FRPEXVWLRQ FKDPEHU EODQNHW EXUQHU VZLQJ GRRU LQVXODWLRQ D...

Страница 70: ...QH 7KH LQWHULRU RI WKH FKLPQH XH PXVW EH inspected and cleaned before the start of the heating season and should be inspected periodically throughout WKH KHDWLQJ VHDVRQ IRU DQ REVWUXFWLRQV FOHDQ DQG X...

Страница 71: ...7KH VPDOOHU WKH ULQJ UDWH WKH VPDOOHU WKH VORWV EHFRPH LQ WKH QR OH DQG WKH PRUH SURQH WR SOXJJLQJ LW EHFRPHV ZLWK WKH same amount of dirt SECTION XV TROUBLESHOOTING 7 5 DWHU LQ WKH IXHO LQ ODUJH DPR...

Страница 72: ...if the Oil Primary Control locks out three 3 times during a call for heat This is indicated by red light reset button solid on C INTELLIGENT OIL BOILER CONTROL ROG 6WDUW RLOHU RQWURO is used on Boile...

Страница 73: ...d powered during safety output relay check sequence or un powered during running or powered in idle in combination with water temperature above 264 F limit Cycle power to the control Replace control i...

Страница 74: ...RFDO 8 6 RLOHU RPSDQ KROHVDOH GLVWULEXWRU 6KRXOG RX UHTXLUH DVVLVWDQFH LQ ORFDWLQJ D 8 6 RLOHU RPSDQ LVWULEXWRU LQ RXU DUHD RU KDYH TXHVWLRQV UHJDUGLQJ WKH DYDLODELOLW RI 8 6 RLOHU RPSDQ SURGXFWV RU U...

Страница 75: ...Lg 80861035 2 Tie Rod 3 8 16 x 37 Lg 80861105 2 Tie Rod 3 8 16 x 42 Lg 80861106 2 1G 3 8 Flat Washer 80860600 4 4 4 4 4 4 4 1H 3 8 16 Hex Nut 80860423 4 4 4 4 4 4 4 1J Heater Cover Plate Gasket Front...

Страница 76: ...76 Bare Boiler Assembly Continued SECTION XVI REPAIR PARTS continued...

Страница 77: ...802 2 2 2 2 2 2 2 1W 5 16 18 x 5 8 Lg Plated Cap Screw 80861377 2 2 2 2 2 2 2 1X Intermediate Hinge Painted Black 7022801 1 1 1 1 1 1 1 1Y Hinge Pin 80861707 2 2 2 2 2 2 2 1Z 042 Dia x 15 16 Lg Hairpi...

Страница 78: ...78 Jacket Assembly SECTION XVI REPAIR PARTS continued...

Страница 79: ...52 02 102952 03 1 102952 04 1 102952 05 1 102952 06 1 102952 07 1 102952 08 1 102952 09 1 2F Jacket Top Panel Assembly 604280221 604280321 1 604280421 1 604280521 1 604280621 1 604280721 1 604280821 1...

Страница 80: ...80 V8H3 Thru V8H9 Steam Boilers Trim and Controls SECTION XVI REPAIR PARTS continued...

Страница 81: ...Set 6 ConBraCo 20 104 10 8056091 1 1 1 1 1 1 1 3L Low Water Cut off McDonnell Miller 67 BC 8 80160597 1 1 1 1 1 1 1 3M Bushing 1 NPT x FPT Malleable 806600507 1 1 1 1 1 1 1 3N Drain Valve NPT ConBraC...

Страница 82: ...82 V8H3 Thru V8H9 Water Boilers Trim and Controls SECTION XVI REPAIR PARTS continued...

Страница 83: ...er Painted Sherpa Blue 61328251 1 1 1 1 1 1 1 4G 2 x 4 Junction Box Painted Sherpa Blue 61328252 1 1 1 1 1 1 1 4H Plug Square Head 1 NPT Packaged 806603515 1 1 1 1 1 1 1 Reducing Bushing 1 NPT x FPT K...

Страница 84: ...84 Beckett AFG Burner SECTION XVI REPAIR PARTS continued...

Страница 85: ...ctor Tube Assembly 5636 5636 5636 Electrode Clamp 149 149 149 Electrode Clamp Screw 4219 4219 4219 Electrode Insulator Assembly 5780 5780 5780 Support Spacer Assembly 5992 5992 5992 Escutcheon Plate 3...

Страница 86: ...5636 Electrode Clamp 149 149 149 149 Electrode Clamp Screw 4219 4219 4219 4219 Electrode Insulator Assembly 5780 5780 5780 5780 Support Spacer Assembly 5992 5992 5992 5992 Escutcheon Plate Adjusting P...

Страница 87: ...DQXIDFWXUHU 7 DUOLQ RPEXVWLRQ 7HFKQRORJ QF 0DSOH 6WUHHW DVW RQJPHDGRZ 0 7HOHSKRQH DFVLPLOH RIELLO 40 OIL BURNER PART NUMBERS FOR V8H SERIES BOILERS 127 KHQ RUGHULQJ SDUWV DOZD V JLYH WKH VHULDO DQG PR...

Страница 88: ...40 F5 5 5 2 0 1 20 x 80B 145 V8H5W 1 65 V1 2 10 5 1 35 x 60B 140 1 35 1 50 1 35 1 35 x 60B 150 40 F5 5 2 4 0 1 35 x 70B 145 V8H6S 1 65 V1 2 10 3 1 35 x 60B 140 EZ 2HP 1 50 1 75 1 35 x 60A 170 40 F10...

Страница 89: ...SUREH 2 LQ WKH VXSSO RU UHWXUQ SLSLQJ DV VKRZQ EHORZ LWCO Location 6HOHFW WKH DSSURSULDWH VL H WHH XVLQJ WKH 2 PDQXIDFWXUHU V LQVWUXFWLRQV 2IWHQ WKH EUDQFK FRQQHFWLRQ PXVW KDYH D minimum diameter to S...

Страница 90: ...J FRQQHFWLRQV DQG LQVWUXFWLRQV WR DOORZ IRU WKLV DSSOLFDWLRQ APPENDIX A LOW WATER CUT OFF LWCO continued How to Test 6KXW RII IXHO VXSSO RZHU ZDWHU OHYHO XQWLO ZDWHU level is 2 WKH 2 HQHUDWH D ERLOHU...

Страница 91: ...mit Installation for Probe LWCO Equipped Boilers Figure 11 23 Burner Disconnect Junction Box with Power Outlet Receptacle Section IV Packaged Boiler Assembly Figure 12 24 Packaged Boiler Removal from...

Страница 92: ...McDonnell Miller 67 Float LWCO Riello Burners Figure 25 48 Schematic Wiring Diagrams For All Burner Options w Various Oil Primary Controls Section X Oil Piping Figure 26 49 Single Pipe Oil Line Figur...

Страница 93: ...pe Systems Table 4 50 Single Stage Units 3450 RPM Two Pipe Systems Section XII Operating Table 5 59 Sequence of Operation Table 6 62 Circulator Pre purge Time Example Parameter pp_ 2 minutes Table 7A...

Страница 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 96: ...96 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...

Отзывы: