background image

42

3.

 Overpressure

(1)

  Install a properly sized expansion tank. 

(2)

  Do not exceed the boiler’s specific  

 requirements for maximum allowable  

 working pressure. 

(3)

  Do not plug or block the relief valve.

4.

 Freezing

(1) 

Run all portions of the system piping 

inside a heated space unless the system 

is properly protected with an inhibited 

antifreeze solution.

5.

 Overheating

(1)

   Comply with the boiler’s specific    

 requirement for minimum water flow  

 through the boiler.  See the   
Specifications

 Section of this manual.

(2)

  Install a low-water cutoff device  

whenever the boiler is installed above  

the level of the lowest heat emitter  

or radiator. Also add a low-water 

cutoff when required by local code 

requirements.

  

It is recommended that the LWCO control 

is installed above the boiler to provide 

the highest level of protection.  However, 

where the LWCO control is approved 

by the LWCO control manufacturer for 

installation in a high boiler tapping of a 

water boiler, the use of the listed LWCO 

control is permitted when it is installed 

according to the LWCO manufacturer's 

instructions.  

6.

  Thermal shock

(1)

  Do not over-pump. Adhere to the design  

 flow requirements for each zone.

(2)

  Install a boiler bypass, system bypass,  

 or primary-secondary loop when needed  

 to avoid returning large volumes of cold  

 water directly to a hot boiler.

7.

  Condensation

(1)

  Do not over-pump. Adhere to the design  

 flow requirements for each zone.

(2) 

Adhere to the boiler’s specific  

 

minimum return water and supply water  

 temperature requirements. Install a  

 boiler bypass, system bypass, or    

 primary-secondary loop when needed to  

 maintain water temperatures and flows  

 within the specified limits.

(3)  Do not allow chilled water to enter the  

 boiler during the heating cycle, or heated  

 water to enter chilled water coils during  

 the cooling cycle.

8.

  Dry Fire

  Install a low-water cutoff when the boiler 

is installed above the level of the lowest 

radiator and when required by local code.

9. 

Combination Heating and Cooling Systems

 

If this boiler is used in connection with 

refrigeration systems, the boiler must be 

installed so that the chilled medium is piped 

in parallel with the heating boiler using 

appropriate valves to prevent the chilled 

medium from entering the boiler, see Figure 

D-W1.  Also consult  Residential Hydronic 

Heating Installation and Design I=B=R 
Guide.

  If this Boiler is connected to heating coils 

located in air handling units where they may 

be exposed to refrigerated air, the boiler 

piping must be equipped with flow control 

valves to prevent gravity circulation of boiler 

water during the operation of the cooling 

system.

i        

   The following system diagrams are intended to provide a minimum level of guidance for a 

            successful and trouble-free installation of the boiler in common applications. They do not substitute  
            for proper design, evaluation, and installation by a trained and qualified installer using the proper  
            tools, techniques, and design expertise.  Not all options are available with every boiler.

APPENDIX D – System Piping (continued)

Figure D-W1:  Recommended Piping for 

Combination heating & Cooling

(Refrigeration) Systems

Содержание SERIES 3

Страница 1: ...tor When seeking information on boiler provide Boiler Model Number and Serial Number as shown on Rating Label Boiler Model Number 30__B Boiler Serial Number Installation Date Heating Contractor Phone...

Страница 2: ...stem is cool and free of pressure and that your clothing will protect you from a release of hot water or steam Do not rely solely on the boiler s temperature and pressure gage when making this judgmen...

Страница 3: ...ure Gage NPT 100282 01 q Circulator Mounting Hardware Kit 1 1 4 NPT 6056007 q Drain Valve NPT 102802 01 q Pressure Relief Valve 30 psi 81660363 q Water Manifold for Pressure Relief Temp Gage 80607001...

Страница 4: ...imensions and Connections Electrical Requirements 120VAC 60 hz 1 ph 15A Maximum Allowable Working Pressure 50 psi Boiler shipped from factory with a 30 psi relief valved Boiler Model Allowable Supply...

Страница 5: ...5 Figure S 1 Minimum Clearances to Combustibles and Alcove Dimensions SPECIFICATIONS continued...

Страница 6: ...9 Check for gas and water leaks 16 10 Perform startup checks and adjustments 17 Annual Maintenance Checklist 18 Troubleshooting 19 Repair Parts List 25 Internal Wiring 31 Appendices A Combustion Air...

Страница 7: ...e contents from the skid except the boiler 3 Remove the four 4 hex drive lag screws holding the boiler to the skid Figure 1 a DO NOT DAMAGE front air dam It is required for proper operation of the boi...

Страница 8: ...y cause fire or explosion CLEAN BURNERS DAILY if operating the boiler in a dusty environment PROTECT IGNITION SYSTEM COMPONENTS from sources of water that may spray drip or rain on them during install...

Страница 9: ...lop a positive flow adequate to convey flue or vent gases to the outdoors while ensuring that flue gases do not cool prematurely Observe all general venting guidelines provided in Appendix B Venting A...

Страница 10: ...S PIPING MUST BE GAS TIGHT Use gas rated thread compound on all threaded joints to avoid leaks which may result in fire or explosion SIZE GAS PIPING regulators valves and meters so as to provide an ad...

Страница 11: ...6 CONNECT BOILER WATER PIPING continued 9 See Figure 6b for suggested near boiler piping of IQ Options 6 b Item Description Part Number 1 1 x 1 x Tee 806601021 2 Immersion Well NPT 80160456 3 1 x 6 Ni...

Страница 12: ...arked circulator WIRE AN ADDITIONAL SAFETY LIMIT such as a low water cutoff or temperature limit device other than an IQ Control device in series with the 120V circuit used to power the boiler Do not...

Страница 13: ...next Each setting will alternately flash between the relevant display code and its corresponding value Operating Mode Options StA Status bt Boiler Temperature SP Operating Setpoint Outdoor Reset HL H...

Страница 14: ...The Outdoor Reset IQ Option Card reduces the Operating Setpoint to regulate heat delivery increase home comfort and save energy Refer to the Appendix I for additional information The High Limit Setpo...

Страница 15: ...r heat does not force off the system circulator The Priority Time has a factory setting of On and is field adjustable between On and Off Refer to Table 8b 7 Domestic Hot Water DHW Terminal Function dh...

Страница 16: ...o add functionality safety and efficiency to your heating system The IQ Option Panel provides an easy and convenient means to plug in an Auxiliary High Limit Low Water Cut off and or Outdoor Reset fun...

Страница 17: ...an and blue 6 Disconnect pilot lead wires from gas valve Figure 10 b q Boiler shuts off 7 Reconnect pilot lead wires to gas valve q Boiler restarts 8 Adjust zone thermostat to minimum setting q Boiler...

Страница 18: ...Clean low water cutoff probe if applicable 2 Inspect vent for obstruction and signs of condensation distortion overheating or gas leakage 3 Clean vent terminal and air intake screens 4 Inspect boiler...

Страница 19: ...ve control or component is generally the least likely cause Before replacing a component try to rule out all other possible causes 5 When checking voltage across wiring harness pins be careful not to...

Страница 20: ...If problem persists replace control eRR 35 Duplicate Zone Alarm Refer to IQ Zone Panel Instructions Err 55 Damper Failed to Open Atmospheric Damper End Switch failed to close end switch contacts stuck...

Страница 21: ...ain on until the thermostat is turned off The source of blockage must be corrected by trained and skilled personnel from a qualified service agency before resetting switch Blocked Vents are caused by...

Страница 22: ...nded corrective action Err 23 Flame sensed during post purge before gas valve signaled open Check the gas valve for proper operation Replace gas valve is problem persists STA 14 Hard Lockout When a ha...

Страница 23: ...ot supply tubes of air b If no gas flow check the following 24 volts across PV and MV PV at gas valve if voltage ok replace defective gas valve Check for break in wiring harness to gas valve 24 volts...

Страница 24: ...l are not causing the open limit IQ Option Panel Display Shows ERR Display Status Boiler Control Action s Err 1 Low Input Voltage AC voltage is too low Err 2 card IQ Option Card Type Change without Re...

Страница 25: ...305B 306B 307B 308B 309B 1A Block Assembly 102287 03 102287 04 102287 05 102287 06 102287 07 102287 08 102287 09 1B Canopy Gasket Kit 6206001 1C Canopy Assembly 102554 03 102554 04 102554 05 102554 0...

Страница 26: ...02705 03 102705 04 102705 05 102705 06 102705 07 102705 08 102705 09 2E Burner Access Panel 102707 03 102707 04 102707 05 102707 06 102707 07 102707 08 102707 09 2F Base Gasket Kit 6206002 2G Base Sid...

Страница 27: ...old 82207031 82207041 82207051 82207061 N A Gas Manifold N A 82207071 82207081 82207091 3C Burner Orifices Natural Gas 47 4 822710 6 822710 8 822710 10 822710 12 822710 14 822710 16 822710 Burner Orif...

Страница 28: ...ey No Description Quantity Part Number 303B 304B 305B 306B 307B 308B 309B 4A Control 103660 01 4B IQ Option Panel 102291 01 4C Transformer 102516 01 4D Temperature Sensor 102411 01 Temperature Sensor...

Страница 29: ...2565 07 102565 08 102565 09 5E Jacket Top Panel 102568 03 102568 04 102568 05 102568 06 102568 07 102568 08 102568 09 5F Jacket Front Door 102576 03 102576 04 103717 05 103717 06 103717 07 103717 08 1...

Страница 30: ...7B 308B 309B 6A Supply Water Manifold 80607001 6B Temperature Pressure Gauge 100282 01 6C 30 PSI Relief Valve 81660363 6D Drain Valve 102802 01 6E Vent Damper 102284 01 102284 02 102284 03 102284 04 1...

Страница 31: ...31 INTERNAL WIRING Figure IW 1 Wiring Diagram...

Страница 32: ...32 INTERNAL WIRING continued Figure IW 2 Wiring Schematic...

Страница 33: ...33 INTERNAL WIRING continued Figure IW 3 Multiple Zone System with Zone Circulators Figure IW 4 Multiple Zone System with Zone Valves...

Страница 34: ...N O COM N C ZONE 4 RELAY DHW CIRCULATOR SUPPLIED BY OTHERS JUMPER 3 4 2 WIRE ZONE VALVE NO END SWITCH 2 WIRE ZONE VALVE NO END SWITCH 1 4 WIRE ZONE VALVE POWER OPEN SELF CLOSING JUMPER 3 4 PRIORITY Z...

Страница 35: ...s the boiler located in a building of unusually tight construction 5 If the answer to all of the three questions below is yes then you must provide outdoor air to the boiler room Do the walls and ceil...

Страница 36: ...ing connected to the common venting system are not in operation 1 Seal any unused openings in the common venting system 2 Visually inspect the venting system for proper size and horizontal pitch and d...

Страница 37: ...ture de d charge Utiliser la flamme d une allumette ou d une chandelle ou la fum e d une cigarette d un cigare ou d une pipe APPENDIX B Venting continued 6 Une fois qu il a t d termin selon la m thode...

Страница 38: ...t be vented into the same chimney space as this boiler DO NOT REDUCE THE DIAMETER of the vent connector between the boiler and the chimney It must not be smaller than the outlet on the draft hood damp...

Страница 39: ...manuel dans le code local et le National Fuel Gas Code ou CAN CSA B149 1 Les chemin es en ma onnerie rev tues int rieurement d argile ne respectent pas les exigences d vacuation de cet appareil NE PAS...

Страница 40: ...1400 20 92 190 350 730 120 250 465 950 30 73 152 285 590 97 200 375 770 40 63 130 245 500 82 170 320 660 50 56 115 215 440 73 151 285 580 60 50 105 195 400 66 138 260 530 70 46 96 180 370 61 125 240...

Страница 41: ...iler and provide many years of comfort to the building occupants Be sure to protect the boiler from the following problems 1 Corrosion 1 Comply with the boiler s specific water quality requirements Se...

Страница 42: ...urn water and supply water temperature requirements Install a boiler bypass system bypass or primary secondary loop when needed to maintain water temperatures and flows within the specified limits 3 D...

Страница 43: ...43 APPENDIX D System Piping continued Figure D W2 Recommended Water Piping for Zone Valve Zoned heating Systems...

Страница 44: ...44 APPENDIX D System Piping continued Figure D W3 Recommended Water Piping for Circulator Zoned heating Systems...

Страница 45: ...onvector and repeat procedure until all convectors in the loop are purged of air 10 Close the opened zone valve or shut off valve for the zone being purged of air 11 Open the zone valve or shut off va...

Страница 46: ...djustment screw clockwise to increase manifold pressure or counterclockwise to decrease manifold pressure Figure F 2 Several turns may be required Do not force the adjustment screw DO NOT EXCEED the b...

Страница 47: ...matches the required CO2 or O2 specified for the boiler If CO2 O2 or CO fall outside of the range specified for the boiler review the installation and startup instructions and make any necessary adjus...

Страница 48: ...vides status information to help determine the cause of the problem Table 5 provides a list of boiler status codes that are reported Refer to the Troubleshooting Section for more information Status Co...

Страница 49: ...outdoor temperature increases the Operating Setpoint temperature is reduced from the High Limit Setting to save energy while improving home comfort By better matching boiler heat supply to actual home...

Страница 50: ...The Operating Setpoint is set to the DHW Setpoint when the Control or Outdoor Reset Option Card DHW input is energized This setpoint is set equal to the Indirect Water Heater manufacturer s recommende...

Страница 51: ...t curve to save energy while the home is in a reduced room temperature mode Honeywell VisionPro IAQ Setback Thermostat Honeywell P N TH942lc1004 The Display Kit provides a 3 5 LCD multi color Touch Sc...

Страница 52: ...nal pipe fittings are required 102717 01 Aquastat IQ Option Card 130 220 F 15 F Adjustable Differential Auto Reset for use with Option Control Panel Temperature Sensor with 36 inch lead Well Sensor Cl...

Страница 53: ...53 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 54: ...54 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 55: ...55 SERVICE RECORD DATE SERVICE PERFORMED...

Страница 56: ...56 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...

Отзывы: