
21
VII. Venting
A.
Install
vent system
in accordance with local building
codes; or local authority having jurisdiction; or
"Venting of Equipment", of the
National Fuel Gas
Code
, ANSI Z223.1/NFPA 54, or "Venting Systems and
Air Supply for Appliances", of the
National Gas and
Propane Installation Code
, CAN/CSA B149.1.
Install any of the following for this Independence Series
Category I, draft hood equipped appliance:
1. Type B or Type L gas vent. Install in accordance
with listing and manufacturer's instructions.
2. Masonry or metal chimney. Build and install in
accordance with local building codes; or local
authority having jurisdiction; or
Standard for
Chimneys, Fireplaces, Vents, and Solid Fuel
Burning Appliances
, ANSI/NFPA 211 and/or
National Building Code of Canada
.
Masonry chimney must be lined with approved clay
flue lining or listed chimney lining system
.
3. Single wall metal vent. Allowed by ANSI Z223.1/
NFPA 54 under very restrictive conditions.
4. Do not use cellular core PVC (ASTM F891),
cellular core CPVC, or Radel
®
(polyphenolsulfone).
5. Do not cover non-metallic vent pipe and fittings
with thermal insulation. Note: Non-metallic vent
cannot be used with this boiler.
B.
Inspect chimney
and remove any obstructions or
restric tions. Clean chimney if previously used for solid
or liquid fuel-burning appliances or fireplaces.
DANGER
Inspect existing chimney before installing boiler.
Failure to clean or replace perforated pipe or tile
lining will cause severe injury or death.
C.
Boiler Equipped With Vent Damper
1. Open Vent Damper Carton and remove Installation
Instructions. Read Installation Instructions thoroughly
before proceeding.
CAUTION
Do not use one vent damper to control two
heating appliances.
Provide adequate clearance for servicing -
6" (152 mm) minimum clearance between
damper and combustible construction.
NOTICE
DO NOT force the vent damper over the
rolled bead on the draft hood collar. The
vent damper should rest on the rolled bead.
Please refer to the specifications,
installation instructions and trouble
shooting guide packed in the vent damper
carton for complete detailed installation
instructions.
2. Vent damper should be same size as draft hood
outlet. See Figure 1. Unpack vent damper carefully
-
DO NOT FORCE CLOSED!
Forcing vent
damper may damage gear train and void warranty.
Vent damper assembly includes pre-wired
connection harness with polarized plug for use on
all 24V standing pilot or intermittent ignition (EI)
control systems.
3. Mount vent damper assembly on draft hood without
modification to either (Refer to instructions packed
with vent damper for specific instructions). Vent
damper position indicator to be visible to users
following installation.
4. USA - Do not install Non-listed vent damper or
other obstruction in vent pipe.
Canada - Do not install Non-listed vent damper or
other obstruction in vent pipe.
5. Arrange venting system so only the boiler is served
by vent damper supplied with boiler.
WARNING
This boiler needs fresh air for safe operation and must be installed so there are provisions for
adequate combustion and ventilation air.
Read, understand and follow combustion air instruction restrictions contained in the Pre-Installation
instructions of this manual.
Do not operate boiler where gasoline or other flammable vapors or liquids, or sources of hydrocarbons
(i.e. bleaches, cleaners, chemicals, sprays, paint removers, fabric softeners, etc.) are used, stored and/
or present in the air.
Содержание INDEPENDENCE
Страница 4: ...4 Figure 1 Dimensional Drawing...
Страница 28: ...28 Figure 32 Wiring Diagrams Steam Intermittent Ignition EI Probe Low Water Cutoff VIII Electrical continued...
Страница 32: ...32 Figure 34 Wiring Diagrams Steam Intermittent Ignition EI Float Low Water Cutoff VIII Electrical continued...
Страница 35: ...35 Figure 38 Lighting Instructions Continuous Ignition System 7000 ERHC Gas Valve IX System Start up continued...
Страница 56: ...56 Manifold and 1 Main Burners XI Repair Parts continued...
Страница 62: ...62 XI Repair Parts continued...
Страница 64: ...64 XI Repair Parts continued...
Страница 72: ...72 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...