U-Line H-9700 Скачать руководство пользователя страница 5

PAGE 5 OF 15 

1221 IH-8928

OPERATION CONTINUED

MAINTENANCE

WARNING! Never use the dumper if any 

damage or unusual motion is observed, if 

it is in need of repairs, or if it seems to be 
malfunctioning. 

Notify supervisor or maintenance personnel if anything 

seems out of the ordinary.
Ensure all safety and warning labels stay in place and 

are legible. Refer to the warning labels section.

WARNING! Care should be taken to identify all 
potential hazards and comply with applicable 
safety procedures before beginning work.

Only qualified individuals trained to understand 

mechanical devices and their potential movements 

and hazards should attempt troubleshooting and repair 

of this equipment.

Repairs must only be performed by suitably trained 

personnel with access to the appropriate equipment 

and tools.

BEFORE EACH USE 

Inspect for the following:

1.  Frayed or damaged pull cable.

2.  Damage or structural deformation to the hopper, or 

the dumper's frame.

3.  Proper locking of the latch lock bracket.

4.  Unusual noise or binding while dumping, or 

evidence thereof.

5.  Evidence of fatigue or damage to the securing 

chain, its attachment point, or its quick-link.

MONTHLY MAINTENANCE

Inspect for:

1.  Pivot point wear.

2.  Integrity of all pivot point pins.

3.  Looseness, wear or damage to the casters' bearings, 

mounting hardware or surface material  

(portable units only).

4.  Proper functioning of the releasing mechanism.

5.  Unusual noises or movement when dumping.

6.  All the information, safety and warning labels are in 

place and in good condition.

7.  Dirt and debris in any area that could affect normal 

operation or dumping motion.

1-800-295-5510

uline.com

Содержание H-9700

Страница 1: ...6 Ensure that the dumper is locked in place and secured to the fork truck s fork mast before transporting it or raising it off the ground 7 Maintenance and repairs are to be done only by personnel qu...

Страница 2: ...e 2 NOTE Install release lever rod from back of hopper forklift side into front dumping side 4 Slide rod into guide ring far enough to ensure it clears the lock release lever NOTE The release lever ro...

Страница 3: ...ee Figure 5 7 Slide large clevis pin through bumper plate and fork pocket base Attach large cotter pin 8 Rotate dumping hopper back to the upright position See Figure 6 NOTE Ensure lock release lever...

Страница 4: ...nel or permanent damage to the equipment could result from overloading DUMPING WARNING To minimize the risk to yourself and others always carefully watch the hopper and its load when transporting or e...

Страница 5: ...ormed by suitably trained personnel with access to the appropriate equipment and tools BEFORE EACH USE Inspect for the following 1 Frayed or damaged pull cable 2 Damage or structural deformation to th...

Страница 6: ...miento y las reparaciones se deben realizar solo por personal calificado para el trabajo requerido 8 Use solo partes de repuesto aprobadas de f brica 9 El ensamble se debe llevar a cabo por personal d...

Страница 7: ...ci n de la parte posterior de la tolva lado del montacargas en el lado frontal de descarga 4 Deslice la varilla en el anillo gu a lo suficiente hasta despejar el seguro de la palanca NOTA La varilla d...

Страница 8: ...grande a trav s de la placa parachoque y la base del hueco para horquillas Fije el pasador de chaveta grande 8 Gire la tolva autovaciable de nuevo a la posici n vertical Vea Diagrama 6 NOTA Aseg rese...

Страница 9: ...A Para minimizar el riesgo a usted o a otros siempre observe la tolva y su carga con cuidado al transportarla o vaciarla 1 Desde la parte posterior de la caja de volteo inserte las horquillas del mont...

Страница 10: ...es se deben llevar a cabo por personal debidamente capacitado que tenga acceso al equipo y las herramientas adecuadas ANTES DE CADA USO Inspeccione lo siguiente 1 Cable de tracci n deshilachado o da a...

Страница 11: ...7 Toute op ration d entretien et de r paration doit tre effectu e uniquement par un personnel qualifi pour r aliser les travaux demand s 8 Utilisez uniquement des pi ces de remplacement approuv es par...

Страница 12: ...passer la tige du levier de d gagement de l arri re de la benne c t chariot l vateur sur le c t avant de d chargement 4 Faites glisser la tige dans l anneau de guidage suffisamment loin pour lib rer l...

Страница 13: ...Faites glisser la grande goupille de chape travers la plaque de but e et la base du passage de la fourche Fixez la grande goupille fendue 8 Remettez la benne en position verticale Voir Figure 6 REMAR...

Страница 14: ...benne au del de ses rebords Une surcharge peut blesser le personnel ou endommager l quipement de fa on permanente D CHARGEMENT AVERTISSEMENT Pour votre s curit et celle d autrui ainsi que pour minimi...

Страница 15: ...angers potentiels doivent effectuer le d pannage et les r parations de cet quipement Les r parations doivent tre effectu es par du personnel d ment form ayant acc s l quipement et aux outils appropri...