Installation and commissioning
8
.06
Fitting the reel stand
● Fit the reel stand as shown in Fig.
8-10.
● Afterwards insert the stand in the hole in
the table top and secure it with the nuts
provided.
Fig. 8 -10
8
.07
Commissioning
● Check the machine, particularly the electrical wiring, for any damage.
● Clean the machine thoroughly and then oil it or fill in oil (see Chapter
10
Care and mainte-
nance).
● Have a mechanic check whether the motor of the machine can be operated with the avai-
lable power supply, and that the motor is correctly connected in the junction box.
If there are any discrepancies the machine must not be operated under any cir-
cumstances.
Before starting up the machine for the first time, have specialists check
whether parameter
799
(machine class) is set at "2,
4"
or "6 " depending on the
control unit, and parameter
800
(sewing direction) is set at "1" (see Chapter
8.09 Basic position of the machine drive unit).
On machines with PicoDrive
and control unit P44 PD-L it is also necessary to check whether parameter
802
on the
571
and
591
are set at "0", and on the
574
at "1". If necessary, have
these adjustments made.
The machine may only be connected to an earthed socket!
8
.08
Sw itching the machine on/off
● Switch the machine on or off (see Chapter
7.01
On/off switch).
28
Содержание TW1-571
Страница 1: ...TW1 571 574 591 POSTBED SEWING MACHINE INSTRUCTION MANUAL...
Страница 2: ......
Страница 4: ...This Instruction Manual is valid for all models and subclasses listed in the chapter Specifications...
Страница 50: ...Circuit diagrams 11 05 03 Version 18 06 07 91 191 524 95 Part 1 Circuit diagrams 91 191 524 95 48...
Страница 51: ...91 191 524 95 Part 2 Version 18 06 07 Circuit diagrams 49...
Страница 53: ...91 191 534 95 Part 1 11 05 05 Version 12 03 08 Circuit diagrams Circuit diagrams 91 191 534 95 51...
Страница 54: ...Circuit diagrams Version 12 03 08 91 191 534 95 Part 2 52...
Страница 57: ...Notes...