13.Remove the 4WD shaft couplers by removing
snap ring and sliding couplers onto shaft until
clear of stub shaft
14.Remove the brake linkage, and remove brake
rods from tractor
15.Remove hydraulic pressure tube clamp
Magnetic cruise
4-19
Front 4WD shaft Rear
Tube
Brake linkage
17.Remove a magnetic cruise
next to hy
drostatic
control pedal.
12.Disconnect the input drive shaft and couplers by removing snap ring and sliding couplers onto
engine until clear of stub shaft.
③
②
⑤
①
④
16.Disconnect the linkage from hydrostatic
control system
Содержание T264
Страница 14: ...1 11...
Страница 15: ...1 12...
Страница 22: ...SECTION 3 GEAR TRAIN DIAGRAMS 1 19 FIG 1 3 GEAR TRAIN DIAGRAM...
Страница 33: ...SECTION 2 OPERATION CHART FOR DISASSEMBLY AND REASSEMBLY BY MAJOR BLOCKS 2 4...
Страница 60: ...3 HST main pump case 4 5...
Страница 64: ...6 Hydrostatic system schematic 4 8...
Страница 101: ...3 Rear transmission case 5 15 Fig 5 23...
Страница 122: ...Fig 5 60 5 36 Power Train Diagram...
Страница 202: ...SECTION 6 WIRING DIAGRAM A3 10 12...