2
Qwik Install
STEP 1:
Prepare the enclosure: Install DIN rail (if required) to door
using two Philips head screws. Install just the top mounting bracket to
the enclosure using two 8mm bolts.
NOTE:
It takes two people to mount the
enclosure to a pole. The standard U
-
Bolt mounting accommodates a pole up
to
4”
diameter. Multiple pole straps can
be used for extra strength. Pole straps
are available for poles up to
11”
diame-
ter or larger.
STEP 2:
Install the bottom bracket
and stabilizer bracket to the pole using
U
-
Bolt and/or Pole Straps. The stabi-
lizer bracket is used as an aid to
mounting and additional support when
mounted.
STEP 3:
Lift the enclosure and place it
on the stabilizer bracket. Connect the
top bracket to the pole using U
-
Bolt
and/or Pole Straps.
STEP 4:
Attach The two 8mm bolts that
hold the bottom bracket to the enclo-
sure. Make sure all bolts are tight. (8
-
15
ft lbs)
STEP 5:
Install the three wire feedthru
cable glands in the holes in the bottom
of the enclosure. If one or more of the
cable glands will not be used, just cut a
short piece of wire and tighten in the
cable gland.
NOTE:
The bottom plate can be re-
moved from the enclosure if you need
to add some additional feedthru. (ex;
conduit connection)
STEP 6:
Install the batteries in the enclosure. There
must be at least four batteries connected in series to
create 48V. If eight batteries are used connect first
four in series and second four in series then parallel
the two banks. (See wiring diagram).
Note:
The enclosure has slot features that can be
used to strap the batteries if desired. Tycon
®
has vel-
cro straps available. It takes two straps per battery.