11
English
7.7.1
Turn the program control (2) to
position S .
7.7 Closing the splice and removing the
fiber out of the fiber holder
7.6.5
Remove the fiber guiding block and
slide the fiber holder till it clicks.
7.6.4
Hinge the fiber holder to the
horizontal position and check the cleave
length (see 7.5.1). Slide the fiber holder
towards the fiber guiding block till it goes no
further.
7.7.2
Hinge the fiber clamp lever (10) in
position I and hold the lever in position
during removing the fiber completely out of
the two clamps.
Important
: do not move the clamp lever
(10) from its position I when removing the
fiber out of the front fiber clamp (9).
The tool must be set in lock position by
hinging the fiberholder (7) down and pushing
it towards the center of the RCAT, turning the
program controller (2) in lock position
(position
) and hinging the handle (17)
above the fiberholder (7). Place the tool in its
transportcase.
7.8 Locking and storing the tool after
splicing
7.7.3
To install the second fiber, lift the
fiber holder (7). Slide splice holder (4) to the
opposite side. Repeat all the steps starting
from point 7.2.4.
Содержание RECORDsplice
Страница 2: ...5 2 3 4 9 6 8 10 11 12 13 15 16 17 18 19 3 8 18 19 14 7 11 1...
Страница 14: ...14...
Страница 15: ...I N S T R U C C I O N E S D E I N S T A L A C I N Systema de conexi n Espa ol...
Страница 27: ...N O T I C E D I N S T A L L A T I O N Syst me de raccordement Fran ais...
Страница 39: ...M O N T A G E A N W E I S U N G Splei system Deutsch...
Страница 51: ...I N S T A L L A T I E I N S T R U C T I E RECORDsplice Verbindingssysteem Nederlands...
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......