8
3.6.1
Entering the shelf from the side with the FOPT up to the tray.
3.6
Termination of ribbon cable and microgain cable
Entering with fopt trough the trumpet (back or side)
up to the tray
3.5.2
Termination up to the tray, fixation together with the spiral
tube. Check the positions of the spiral tubes.
3.5.3
Back termination of the IFC cable, routing inside the shelf is the
same as the previous one.
3.6.2
Fixation of the FOPT is the same as for the spiral tube. One
FOPT to the first tray the other to the second tray, look closely to the
routing of the spiral tubes.( see 3.4.10 ).
Содержание FOMS-FSP-O Series
Страница 11: ...11...