21
6.
Remove the PnP cap. Use your left hand to hold the load plate.
Then use your right thumb to remove the PnP cap from the load plate.
With the package in the socket, the PnP cap removal process will not
damage the contacts.
7.
Close the socket. Rotate the load plate onto the package lid.
Engage the load lever while pressing down lightly onto the load plate.
Secure the lever near the hook end under the retention tab.
8.
Repeat this procedure for the second processor if necessary.
Содержание THUNDER N4250QE
Страница 4: ...4...
Страница 9: ...9 2 2 Block Diagram Thunder n4250QE S4985G3NR Block Diagram...
Страница 16: ...16 SYSFAN4 SATA 0 1 2 3 4 5 6 7 SYSFAN3 SYSFAN6 SYSFAN2 SYSFAN1 SYSFAN0 SYSFAN5 SYSFAN7...
Страница 66: ...66 NOTE...