Twin Busch GmbH
8
Turn on the power switch
Press UP button
Motor drives the gear pump work
Cylinder piston drives the chain work
Chain drives the carriage rise
The lift is raised
Start
Start
Turn on the power switch
Press the DOWN button
The lift is lowered
OPERATION INSTRUCTIONS
4.1 Precautions
4.1.1 Check all the joints of oil hoses for leakage.
4.1.2 If a safety device malfunctions the lift shall not be used.
4.1.3 The machine shall not lift or lower an automobile if its center of gravity is not positioned midway of the swing arms.
4.1.4 Operators and other personnel concerned should stand in a safety area during lifting and lowering process.
4.1.5 When lifting arms rise to the desired height, switch off the power at once to prevent any mal-operation done by
unconcerned people.
4.1.6. Make sure the safety lock of the lift is engaged before you start working under the vehicle.
4.2 Flow chart for operation
Raising
Lowering
Содержание 0741187302364
Страница 2: ...Twin Busch GmbH 2 ...
Страница 13: ...Twin Busch GmbH 13 Annex2 Overall diagram ...
Страница 14: ...Twin Busch GmbH 14 Annex3 Floor plan ...
Страница 16: ...Twin Busch GmbH 16 Annex5 Wiring diagram Single phase ...
Страница 17: ...Twin Busch GmbH 17 Three phase ...
Страница 18: ...Twin Busch GmbH 18 ...
Страница 19: ...Twin Busch GmbH 19 ...
Страница 20: ...Twin Busch GmbH 20 ...
Страница 29: ...Twin Busch GmbH 29 Modell Nr A mm B mm C mm D kg E kg F kg G kg TW 250 2720 3850 100 2800 2200 2800 2200 ...
Страница 30: ...Twin Busch GmbH 30 ...
Страница 31: ...Twin Busch GmbH 31 ...
Страница 32: ...Twin Busch GmbH 32 ...
Страница 33: ...Twin Busch GmbH 33 ...
Страница 34: ...Twin Busch GmbH 34 ...
Страница 35: ...Twin Busch GmbH 35 ...
Страница 36: ...Twin Busch GmbH 36 ...