Twin Busch GmbH
3
INDEX
1. Important safety instructions
4-5
1.1 Important notices
1.2 Qualified personnel
1.3 Danger notices
1.4 Training
1.5 Warning signs
2. Overview of the lift
6
2.1 General descriptions
2.2 Technical data
2.3 Construction of the lift
3. Installation instructions
7-8
3.1 Preparations before installation
3.1.1 Tools and equipments needed
3.1.2 A list for parts checking
3.1.3 Ground conditions
3.2 Precautions for installation
3.3 Installation
3.4 Items to be checked after installation
4. Operation instructions
8-9
4.1 Precautions
4.2 Flow chart for operation
4.3 Operation instructions
5. Trouble shooting
10
6. Maintenance
11
7. Annex
12-35
Annex1, Packing list of the whole lift
Annex2, Overall diagram
Annex3,
Floor plan
Annex4, Hydraulic working system
Annex5, Wiring diagram
Annex6, Separated drawings for the lift
Annex7, Spare parts list
Содержание 0741187302364
Страница 2: ...Twin Busch GmbH 2 ...
Страница 13: ...Twin Busch GmbH 13 Annex2 Overall diagram ...
Страница 14: ...Twin Busch GmbH 14 Annex3 Floor plan ...
Страница 16: ...Twin Busch GmbH 16 Annex5 Wiring diagram Single phase ...
Страница 17: ...Twin Busch GmbH 17 Three phase ...
Страница 18: ...Twin Busch GmbH 18 ...
Страница 19: ...Twin Busch GmbH 19 ...
Страница 20: ...Twin Busch GmbH 20 ...
Страница 29: ...Twin Busch GmbH 29 Modell Nr A mm B mm C mm D kg E kg F kg G kg TW 250 2720 3850 100 2800 2200 2800 2200 ...
Страница 30: ...Twin Busch GmbH 30 ...
Страница 31: ...Twin Busch GmbH 31 ...
Страница 32: ...Twin Busch GmbH 32 ...
Страница 33: ...Twin Busch GmbH 33 ...
Страница 34: ...Twin Busch GmbH 34 ...
Страница 35: ...Twin Busch GmbH 35 ...
Страница 36: ...Twin Busch GmbH 36 ...