31
CALIBRATION PROCEDURE
1. Launch the calibra
tion
pr
og
ram. The main wind
o
w appears as b
elo
w.
Fig 2 Calibration main window
2. The pr
obe
and the m
oni
t
o
r’s p
o
rts will be displayed
on
the t
op o
f the screen.
If see the p
o
rt’
s sig
n h
ig
h
lig
hted in
g
reen, it the m
oni
t
o
r and
the probe is
well c
on
nected. If it is n
ot,
th
e po
rt’
s sig
n will b
e hig
h
lig
hted in red.
Fig 3 Status of connected serial port
14.6 CABLIBRATION S/W INSTALLATION
Содержание LVM-173W-3G
Страница 4: ...4 2 CONTROLS FUNCTIONS ...
Страница 5: ...5 5 3 FRONT KEY BUTTON ...
Страница 6: ...6 4 MONITOR DRAWING ...
Страница 7: ...7 5 EXPLODED DIAGRAM ...
Страница 15: ...15 9 PCB BLOCK DIAGRAM ...
Страница 46: ... SDI_IN SDIA_THRU AUDIO_DIN 46 16 1 OSCILLOSCOPE ...
Страница 47: ... EM_AUDIO_L RIGHT_O DATA_IN_A 47 16 2 OSCILLOSCOPE ...
Страница 48: ... PCLK_OUT FGN0 LCD_CLK 48 16 3 OSCILLOSCOPE ...
Страница 49: ... LCD_HS TXOCP VXP_OUT 49 16 4 OSCILLOSCOPE ...
Страница 56: ...56 18 PACKAGE DRAWING ...