![TVILIGHT OPENSKY Zhaga IoT Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/tvilight/opensky-zhaga-iot/opensky-zhaga-iot_installation-manual_1183305007.webp)
R 166202 | Rev. D | Page 7 of 13
www.tvilight.com
A1. Mounting
NOTE:
The content in this Appendix is derived from the
S Connector System Application Specification 114-133074
(12 May 17 Rev 3). For
more detailed installation instructions consult the latest TE Application Specification
document.
A surface shall be provided on luminaire housing that is ideally flat. If a flat surface
is not possible a secondary possibility is to have a flat surface in one direction and
a minimum radius in the other of 500mm to mount the receptacle. To provide a
water tight mounting seal, the luminaire surface must be free of dirt, debris, or burrs.
Sealing gasket provided with the receptacle assembly must be used.
Receptacle can be used on a luminaire housing thickness between 1.5mm to 6.0mm.
When mounting receptacle assembly, it must not rotate during locking washer and
locking nut application. Torque mounting nut within the range of 1.8 to 2.4 N-m using
a 27mm hex socket.
The location of the hole must be on the top side of the luminaire.
Appendix : Zhaga Receptacle Mounting and
Wiring Specification
Receptacle assembly with
pre-installed gasket
Top Side of the
Luminaire housing
Mounting hole
Mounting nut
Lock washer