Page | 2
Contents
1.0
Introduction
1.1
Unsuitable applications
2.0
Complete unit, layout and connections
3.0
Lighting column inspection
3.1
Setting up: probe
3.2
Inspecting wall loss: first scan
3.3
Continuing the inspection
3.4
Finalising the Inspection
3.5
Setting the threshold
3.6
Setting the time off period
3.7
Depth reading
3.8
Likely indications
4.0
FAQ / Troubleshooting
5.0
Additional information
6.0
Annex 1: Unit set up and internal set up view