Installation: 

Before Start-up of the Meter, make certain: 



The meter is properly mounted, secured and piped 



All shipping plugs are removed and lines are clean of all 
debris. 



All connections are tight and there are no leaks 



All bleed and drain valves are closed 



Do NOT smoke near the meter, or use the meter near 
an open flame when metering flammable fluids.  Fire or 
explosions could result. 



This meter is not intended for use with fluids for human 
consumption. 

Make sure that all necessary safety precautions have been 
taken including proper clothing, personal safety equipment 
and fire safety equipment if required. 

Before shipment, protective thread caps were placed in the 
meter and accessories openings for protection.  They should 
remain in place until your are ready to attach the piping. 

The meter must always be securely bolted to a platform or 
supporting member, regardless of the mounting position.  
Never “hang” a meter on the connecting pipe. 

Position the meter with service in mind.  Provide ample work 
space.  Removing covers can be difficult when work space 
is not available.  Always supply a platform or support for the 
meter mounting. 

Prior to meter installation, the entire piping system should be 
thoroughly flushed of all debris with a liquid that is compati-
ble with the construction of the meter. 

Keep all external surfaces of the meter clean. 

Positive displacement meters are designed to operate full of 
liquid.  The meter should be installed in a manner such that 
it remains full of liquid at all times. 

Install the companion flanges.  Tighten to a position that 
allows the meter to bolt to the companion flanges, free of 
pipe stress.  The meter should always be supported by bolt-
ing to a platform.  Never use the connecting pipe as the 
means of support. 

It is recommended that a strainer be installed upstream of 
each meter to prevent damage from foreign matter such as 
weld slag, pipe scale, etc. 

A means to calibrate and prove the meter should be provid-
ed during installation.  An easy means for diverting flow into 
a calibration vessel should be considered. 

 

 

 

Operation Requirements: 

Upstream lines must be maintained full to prevent air from 
entering the meter.  If the upstream or inlet lines are con-
structed in a manner which allows reverse flow, foot or back 
check valves should be installed. 

Underground tanks that are furnished with a submersible 
pump will eliminate many problems that occur with positive 
displacement pumps with suction pipes when the suction 
piping is incorrectly sized creating too large a lift.  

*** Install the Meter and Accessories in Compli-
ance with all applicable local, state and federal 
construction, electrical and safety codes.  Addi-
tionally, the LPG meter must be installed in ac-
cordance with the requirements of ANSI-NFPA 58 

In critical installation, block valves and by-pass lines 
are recommended.  This allows the meter to be ser-
viced without interruption of flow in a critical process 
application. 

Thermal and or over pressure relief  valves are recom-
mended and should be installed whenever it is possi-
ble to block the meter  between two valves.  Thermal 
pressures many times the operating pressure are pos-
sible with only a small rise in temperature. 

Hydraulic shock like thermal expansion can be harmful 
to the meter components.  Consideration should be 
given to designing pumping and piping systems to 
eliminate hydraulic shock. 

Installation  &  Operation 

WIRING  



If the flow meter is part of a dispenser, please refer 
to dispenser manufacturer wiring diagram. 



If the flow meter is used as a ‘stand-alone’ dispens-
ing meter, please refer to: 

 

Page 

for TS06A with ELNC register  

 

Page 

for TS06A with EMR register 

 

Page 

for TS06A used with other registers 

Содержание Sotera TS06AE71

Страница 1: ...S06AE93 __ TS06AE96 with ELNC __ TS06AE71 __ TS06AE72 __ TS06AE73 S No __________________ The flow meter shipped under this general manual has specifically ACCESSORIES REGISTER Backpressure Valve None Strainer RAD register adaptor Vapor Eliminator EMR Register Differential Valve ELNC Register TS06AS86 with thermo well TS06A LPG Anodized Aluminum Electronic Dispenser Meter TS06LPG 6 22 2012 ...

Страница 2: ...eter Maintenance 7 10 Disassembly Flow Meter 9 Inlet Check Valve 10 Strainer 10 Vapor Eliminator 10 Differential Valve 10 Parts List Meter Strainer 13 Differential Valve 11 Inlet Check Valve 11 Vapor Eliminator 11 Troubleshooting 14 SCL Pulser Assembly 15 16 Meter calibration 16 ...

Страница 3: ...nt of a large gas leak Evacuate the area and notify the fire department or oth er appropriate authorities In the event of a small contained gas leak Isolate and stop the leak Prevent accidental ignition Prevent entrance of gas into other portions of the build ing Be aware that LPG is heaver than air and will seek lower levels Evacuate all people from the danger zone See that the gas is dispersed b...

Страница 4: ...means of support It is recommended that a strainer be installed upstream of each meter to prevent damage from foreign matter such as weld slag pipe scale etc A means to calibrate and prove the meter should be provid ed during installation An easy means for diverting flow into a calibration vessel should be considered Operation Requirements Upstream lines must be maintained full to prevent air from...

Страница 5: ...ter inlet valve and allow the meter and pip ing to fill slowly by gravity Crack open the outlet valve and start the pump then slowly open the inlet valve until the system is up to pressure Open the outlet valve fully to establish full flow Check the flow rate to assure the meter is operating within specified rates The meter is not designed to operate on air but the design and materials of construc...

Страница 6: ... 5 6 2 3 5 4 EMR ground 1 The SCL is model specific and in some cases also application specific Do NOT transfer to another flow meter without consulting with Tuthill 2 Use 4 conductor shielded cable 3 Terminate shields at receiving instrument register 4 Move W1 shunt jumper to match operating voltage 5 S1 must be in Q position 6 Output signal has an internal pull up resistor 1000 Ω on each channel...

Страница 7: ...057 ELPS 2057 AC power supply barrier EL0300 5 SCL inside flow meter front cover 1 This drawing does not guarantee compliance for intrinsically safe apparatus Refer to CD1000 CD1001 and State National electrical codes 2 Terminate shields only at J1 4 3 Cable lengths are limited by entity parameters ...

Страница 8: ...ith Backlight Display 10 1 Pulse AC powered through EL2057 1 This drawing does not guarantee compliance for intrinsically safe apparatus Refer to CD1000 CD1001 and State National electrical codes 2 Cable lengths are limited by entity parameters 3 ELPS output option Install U1 R3 TB6 ...

Страница 9: ... installed in the vapor vent line to allow removal of the strainer or service on the meter The vapor release vent line must be returned to the vapor space of the supply tank and normally should not be made common with the other vapor return lines or pump by pass lines When properly installed this line must permit free flow in either direction If the vent line is closed the meter will not function ...

Страница 10: ...Discard and replace the old O ring seals if it is nicked or scratched in any way It is undamaged it can be re used Examine all fasteners make sure fasteners are not bent rusted or have pulled or burred threads The threads should all appear evenly placed If the bolts are bent check the housing and cover for flatness Use a straight edge to determine flatness Use a stone to remove any burrs on the fl...

Страница 11: ...11 Flow Meter Maintenance ...

Страница 12: ...spect the meter body for damage Use 200 grit paper to remove small scratches and blemishes if the dam age is more than superficial replace the body Inspect the post and post plate Replace if there is any wear Inspect the O ring seals and replace any damaged or brittle seals Reinstall the meter in reverse order Install a new oval gear set 17 if necessary Gears should be perpendicular to each other ...

Страница 13: ...rential valve outlet flange Remove the meter as detailed in the METER DISAS SEMBLY section Remove the back check valve assembly 11 Manually open and close the valve to assure proper operations Inspect for dirt of salt build up and clean if necessary Inspect the seals for wear or damage Replace worn or brittle seals Reassemble the valve and install in the strainer hous ing This valve is optional an...

Страница 14: ...STPL SHCS FS2801 2 1 Cover 2 4 Differential Valve CP6101 3 1 O Ring UL Buna SL3224 4 1 Valve Body 3 4 Differential Valve MP6100 5 1 O Ring UL Buna SL3132 6 1 Spring 3 4 Differential Valve MS8035 7 1 Repair Kit Piston 3 4 Differential Valve RK4000 7a 2 U Cup Seal UL Viton SL1212 U 7b 1 O Ring Sq Cut UL Buna SL3212 SQ 7c 1 Seal Retainer ST6102 7d 1 Piston Brass 3 4 Differential Valve MP4000 Item Qty...

Страница 15: ...15 Exploded View ...

Страница 16: ...14 nss nss 17 Gear Set 1 GS550CC 2 GS550CC R 18 O Ring Buna 2 SL3151 4 SL3151 R 19 Meter Body 1 MB2551 2 MB2551 20 1 4 20 x 3 25 SHCS 4 FS2911 4 FS2911 21 Dowel Pins 2 MS2001 4 MS2001 22 Cover Chamber 1 MP2574 2 MP2574 22b SCL Assembly 5V regulated 1 EL0300 5 1 3 2 EL0300 5 1 3 R SCL Assembly 6 12 V or EL0300 5 3 3 or EL0300 5 3 3 23 1 4 20 x 1 25 SHCS 4 FS1803 8 FS1803 24 Gasket Dust Cover 1 SL70...

Страница 17: ...eck pump by pass setting Faulty non functioning pump Differential vale not open or not functioning Replace valve Meter frozen due to build up of salts or frozen material Clean meter internals and inspect for damage Vapor vent line valve shut or obstruction in vapor vent line Open valve or remove obstruction Strainer dirty and plugged Clean Strainer U Cups on differential valve leaking Replace U Cu...

Страница 18: ... an ECF of 0 925 100 108 would be programmed into the SCL and the output pulse frequency would be equivalent to the se lected base resolution of 100 PPL LINEARIZER MODE If a metering device is not producing an output within the limits of accuracy required for an application the SCL may be used as a linearizer A linearizer is a device which rec ognizes the output frequency of the metering device an...

Страница 19: ...5 45 increase in the prover volume To obtain a greater increase in the prover volume S2 must be placed in the minus position and S3 and S4 rotated to the proper position to obtain the desired change in pulse resolution The opposite is true if S2 is already in the minus position at the beginning of calibration Finally Re seal the flow meter Enter date and correction on the permanent flow meter reco...

Страница 20: ...20 NOTES ...

Отзывы: