TT-CL
2
Free Chlorine Sensor
2.0
INSTALLATION
As with all instrumentation the installation and commissioning of this instrument is crucial to its safe and accurate
function. This instrument must be used only for its purpose as outlined in this manual and must be installed and
commissioned in accordance with this manual and by trained and qualified personnel.
2.1
Site Selection
Please choose a suitable location for the installation of the probe and the electronics. The choice of installation
point on any site is a compromise and is best undertaken by experienced installation personnel. The following is
a list of the factors that need to be taken into consideration. This list is not intended as a checklist neither is it
implied that the list is complete.
• Ensure that the mounting allows access to all serviceable parts.
• Try to mount the electronics in a position where they are not habitually hosed down in a cleaning process.
• Consider the length of wiring runs when mounting the instrument.
• Try to keep the electronics away from substations or other large EMI emitters.
• Consider whether the sample will be representative and well mixed.
• Consider sample return points.
• In a plastic run, with a low conductivity sample consider earthing the sample.
2.2
Unpacking
Please have a copy of your order with you when you unpack your instrument. All orders are checked when they
leave the factory. Please double check that you have all the parts that were ordered as soon as you open the box.
This may include (but not necessarily);
Probe
Probe mounting overflow cell.
Electrolyte
Membranes
Abrasive paper (blue)
Manual
CO2 Buffer kit - option
Acid buffer unit - option
If anything is missing, or damaged, please contact your sales outlet immediately. If the instrument needs to be
returned for any reason please follow the instructions given in Appendix C of this manual.