background image

 

 

ii.

 

When  the  batteries  do  not  have  enough  charge  level  to 
ensure  proper  operation,  the  inverter  takes  the  missing 
power  to  meet  the  demand  from  the grid. In  this way  the 
system  works  in  parallel  with  the  network  and  with 
photovoltaic panels. 

 

 

  

 

 

In the end, the Inverter performs the energy balancing functions and ensures the 
operation of the system.   

 

2.

 

      Back-Up mode 

It is a mode that ensures that, when the grid fails, the critical loads connected 
continue  to  operate  thanks  to  the  power  provided  by  the  generation  and/or 
batteries. 

 

 

3.

 

Specifications 

Batteries 

 

Manufacturer:   Turbo Energy SL 

 

Model:   

Lithium Series 5.1kWh 

 

Attached data sheet and instruction manual. 

 

Back-up 
Load 

Carga 
Back-
up 

Load 

Содержание SunBox H

Страница 1: ...Instruction manual SunBox Model H...

Страница 2: ...nd its complementary technical instructions specifically the ITC_BT 03 04 05 and 40 and the rest of the current regulations either locally or regionally Non compliant use use of the product in applica...

Страница 3: ...ons for setting up strings 6 4 2 Preliminary recommendations for installation 6 4 3 DC wiring 10 4 4 AC wiring 10 4 5 Grounding 10 4 5 Recommendations for batteries installation 11 4 5 Commissioning 1...

Страница 4: ...o Hybrid Inverter Series Model 5000 48 o Batteries Lithium Series 5 1kWh 2 Description and operation Description The SunBox consists of a mounted and wired cabinet prepared to include up to 2 Turbo En...

Страница 5: ...way energy is accumulated for later use at times when energy production is not sufficient 2 When the demand for electricity consumption exceeds the energy produced by photovoltaic panels the Inverter...

Страница 6: ...n the end the Inverter performs the energy balancing functions and ensures the operation of the system 2 Back Up mode It is a mode that ensures that when the grid fails the critical loads connected co...

Страница 7: ...Wh DoD 90 Cycles at 90 DoD 6000 Manufacturer Cells CATL Cells Metal Can Type of technology LiFePO4 Nominal battery voltage 51 2V Max current Loading Unloading 50A Communication with BMS CAN Batteries...

Страница 8: ...ept dry and avoid potentially flooded areas The operating temperature range should be considered which must not exceed 50 C or be less than 0 C Take appropriate measures to ensure the operating temper...

Страница 9: ...mm2 hose In case batteries need to be installed the SunBox model H comes ready to store up to 2 Turbo Energy Lithium Series 5 1kWh batteries Its installation is explained below The Network and Back u...

Страница 10: ...parate the general loads top of the image and the back up loads bottom Therefore for easier connection and to avoid handling of the connections of the installation loads the following configuration is...

Страница 11: ...from causing momentary power outages it is proposed to place an automatic switch that allows network power without going through the SunBox The SunBox Model H is not prepared to withstand excessively...

Страница 12: ...l the installation is complete 4 4 AC wiring To connect Grid Back up and Ez meter open the back door of the Model H cabinet and connect to the pointed and identified terminals with colors phase gray n...

Страница 13: ...is turned off and has no grid connection 2 Make sure the battery is also turned off 3 Set up battery switches as follows 4 Place the battery in the capsule structure with the corresponding screws 5 I...

Страница 14: ...with all connections the machine is ready to commission It will proceed as follows 1 Reset the DC and AC protections at the back of the cabinet 2 Start the Batteries To do this press the Power button...

Страница 15: ...iled information refer to the HIS 5000 48 Inverter Manual 6 Security measures To ensure proper installation it is recommended i Use safe mounting tools and install safety devices Use healthy stairs an...

Страница 16: ...rent in the presence of solar radiation and verified that the rest of the lines do have contact technical service 8 Troubleshooting Carefully review the content of Page 10 of the Battery Manual Page 2...

Страница 17: ...TECHNICAL DATA SHEETS APPENDIX INVERTER CHARGER BATTERIES...

Страница 18: ...https www turbo e com Technical data Hybrid Inverter Series 3600 48 and 5000 48 https www turbo e com HYBRID INVERTER WITH BACK UP MODE MAXIMUM CUSTOMER SATISFACTION 5 years...

Страница 19: ...artup voltage 150V Max input current A 11A 11A N MPPTs 2 Strings per MPPT 1 1 Output data CA Nominal Power W 3600W 5000W Max Power W 3960W 5500W Peak Power Offgrid Twice the Nominal Power 10S Max Back...

Страница 20: ...https www turbo e com Technical data Battery Lithium Series 48V 5 1 kWh LONG LASTING LITHIUM ION BATTERIES MAXUMUM CUSTOMER SATISFACTION PLUG PLAY years 10 years https www turbo e com...

Страница 21: ...ting range 48 57 6V Cycle Life 6000 Physical Weight 52 kg Dimensions 475 x 446 x 200 mm Protection class IP20 Battery type LiFePO4 Operation Maximum charge discharge current 50A 0 5 C Temperature oper...