FIG. 11
Next, route the
Leg Press Cable (#55)
around the Pulley 4
1/2 Rd. (#78-Labeled D3). Next, route around the Pulley 4 1/2 Rd.
(#78-Labeled D4). Continue to route through the opening of the
Leg
Press Main Frame (#47)
.
Note
: Refer to the Cable Mapping Diagram on fold-out page 6
for further detailed illustration of the
Leg Press Cable (#55)
routing.
D3
D4
55
47
FIG. 12
Route the
Leg Press Cable (#55)
around the Pulley 4 1/2
Rd. (#78-Labeled D5), and then through the tube of the
Leg Press Bot-
tom Connector (#46)
. Next, route under the Pulley 4 1/2 Rd. (#78-
Labeled D6).
Note
: Refer to the Cable Mapping Diagram on fold-out page 6
for further detailed illustration of the
Leg Press Cable (#55)
routing.
1
46
55
D6
D5
FIG. 14
Attach the
Right Handle (#31)
and the
Left Handle (#32)
to
the
Leg Press Main Frame (#47)
, in the position as shown above,
using two Hex Head Cap Screws 3/8-16 X 3 1/4 (#105), four Flat
Washers SAE 3/8” (#94), and two Nylon Insert Lock Nuts 3/8-16
(#125).
31
32
47
FIG. 13
Continue to route up and over the Pulley 4 1/2 Rd. (#78-
Labeled D7).
Next, attach the
Leg Press Cable (#55)
to the Top Plate/Selector Bar
(#72) using one Split Bolt 1/2-13 X 1 (#171), and one Split Lock Washer
(#176).
Note:
Refer to
Fig. B
on fold-out page 6 for further clarification
of this hardware assembly.
Fully Fasten:
Proceed fully fasten this hardware assembly.
72
D7
55
4
Leg Press Station
Assembly Instructions