FIG. 49
Begin routing the
Pec Dec Cable (#16)
. Attach one
end of the
Pec Dec Cable (#16)
to the
Pec Dec Cam (#9)
and
secure it using one Socket Head Cap Screw 1/4 X 3/4 (#102)
and one Nylon Insert Jam Lock Nut 1/4 -20 (#103). Refer to
Fig. A
on page 18 for further detailed illustration of this
assembly.
FIG. 50
Attach one Nylon Pulley 4 1/2 Rd. (#35) to each of
the
Swivel Pulley Brackets (#25)
and secure them using two
Hex Head Cap Screws 3/8 -16 X 1 3/4 (#79), four Flat Washers
SAE 3/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8-16
(#86). Route the
Pec Dec Cable (#16)
over the Nylon Pulley
4 1/2 Rd. (#35), as shown above. Refer to
Fig. A
on page 18
for further detailed illustration of this cable routing.
FIG. 51
Insert two Nylon Pulleys 4 1/2 Rd. (#35) into the
Offset Pulley Bracket (#23)
and secure them using two Hex
Head Cap Screws 3/8 -16 X 1 3/4 (#79), four Flat Washers SAE
3/8 (#90) and two Nylon Insert Jam Lock Nuts 3/8 -16 (#86).
Next, route the
Pec Dec Cable (#16)
through this bracket, as
shown above. Repeat the same procedure in
Fig. 49
and
Fig.
50
to complete the routing of the
Pec Dec Cable (#16)
. Refer to
Fig. A
on page 18 for further detailed illustration of this cable
routing.
FIG. 52
Attach the
Leg Extension Cable (#15)
to the
Leg
Extension Arm (#42)
and secure it using one Hex Head Cap
Screw 3/8-16 X 1 (#81) and one Nylon Insert Jam Lock Nut
3/8-16 (#86). Refer to
Fig. F
on page 18 for further detailed
illustration of this cable routing.
Owners’ Manual: Assembly Instructions
MSL-IV Muscle IV Home Gym
14
Содержание MSL-IV
Страница 20: ...MSL IV Muscle IV Home Gym 19 ...