![Tsun TSOL-ACU3.0K Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/tsun/tsol-acu3-0k/tsol-acu3-0k_user-manual_1178520014.webp)
12
d. in wall cavities or under stairways.
e. on roofs, except for were specially deemed suitable.
f. under access walkways.
g. sites where the freezing point is reached, like garages, carports or other places.
h. sites with humidity and condensation are above 85%.
i. places with plenty of salt.
j. flooded areas.
k. within 600mm of any hot water unit, air conditioning unit or any other appliance
associated with the pre-assembled integrated battery energy storage system.
4.4 Installation steps for ACU
Before installation, please make sure that the wall has sufficient strength to fix the screws
and bear the weight of ACU.
Step 1
: Pre-check the installation distance of the ACU to other items.
Step 2:
Positioning the Mounting bracket of the ACU to the wall.
Mark the proper positions of mounting bracket and drill holes on those positions (8mm in
diameter, 50mm in depth) by using the mounting bracket as a template, and then use a
rubber hammer to drive the screw fixing seat into the holes to fix the bracket.
Note
!
If any Expansion Battery connected to the ACU, please refer to Chapter
4.5 first.
If ONLY installing the ACU without any Expansion Battery connection,
please go forward to install the ACU with instructions in this section.
Содержание TSOL-ACU3.0K
Страница 1: ...31 TSOL ACU3 0K...
Страница 44: ...42 4 Click Add a New Gateway Logger and input the SN of the monitor logger...
Страница 49: ...47...