13/14
9 Mounting on the Equipment
*Check (inspect) the equipment beforehand.
1) Is the guide rail long and wide enough?
Length:
Long enough to support the Cableveyor
(About half the travel stroke)
Width:
Cableveyor width + less than 20mm
2) The guide rail should be parallel with the
equipment running rail.
3) Guide rail should be level on both sides.
4) Bracket should be mounted at the prescribed height.
Bracket mounting height (H’)
H’=H + (10 – 30)
5) Is there enough space for installation?
Installation height (h)
H + more than
100mm
Installation width (X)
More than +50mm
*Mounting on the equipment
Moving end bracket:
TKP91 H80: Can be mounted on either side.
TKC91 H80: Mount so that foreign matter cannot get inside cover space (see pg. 8).
TKP/TKC91 H56: Mount on bracket A/B side.
Fixed end bracket:
TKP91 H80: Can be mounted on either side.
TKC91 H80
Mount opposite the moving end bracket.
㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷 㩷
TKP/TKC91 H56: Mount on bracket C/D side.
1) Insert the Cableveyor into the center of the guide rail (inner side should face up).
2) Lightly fasten bolts to the fixed end bracket.
3) Lightly fasten the moving end bracket to the equipment (upper side) with bolts.
4) Ensure that both end brackets are parallel, squared, and centered before tightening thoroughly.
Cart
Standard value +3mm
Guide Rail
Less than +2mm
Less than +1mm
Cableveyor Outer Width
Cableveyor Inner Width