3. PRE-INSTALLATION OVERVIEW
This Pre-Installation Guide describes the requirements for preparing for your TruSteel DR-10 installation.
This information in this manual serves as a recommended guide to help you and your contractors
successfully install all required electrical and plumbing for the ancillary equipment.
This guide covers all electrical and plumbing specifications for the chiller, heater, drive panel, and
vacuum pump. This guide does not describe the installation of the DR-10 itself as it is highly
recommended you hire a TruSteel certified installation contractor.
The following portion describes the steps to completing your pre-installation and setting up your DR-10
installation date:
1. Full Payment Recieved
2. DR-10 Shipped (includes all equipment) Note: there may be a case where some parts must be
shipped separate.
3. TruSteel requires the client to properly install (electric) all equipment according to code.
Note: For C1D2 compliancy, all ancillary equipment shall be placed outside the room that the
DR-10 will be run.
The DR-10 vessel and the Mixer Motor are C1D2 compliant.
The hot oil heater and the mixer require 3-phase electrical hookups. The chiller and vacuum pump
require 115V switches.
4. An installation date is determined.
A TruSteel Certied installation technician will contact you to oversee the pre-installation
requirements. A target date can be set for the install. As long as all requirements are met, the
install date will be confirmed.
5. The DR-10 will be installed with training.
The DR-10 installation will be signed off by the client with 100% satisfaction and a 1 year
warranty.