1.
Planning aid
The planning aid provides an overview of the measures to be
taken and preparations to be made.
For details, refer to the corresponding sections of these installa-
tion conditions.
Planning criterion
Required measures
Personnel and training
■
Appoint a member of staff to be responsible for preparations for the delivery of
the machine.
■
Appoint operating and service personnel and programmers.
Installation site
■
Determine the installation site of the machine, taking into account the space
requirements according to the installation plan.
■
Check floor requirements:
−
Floor quality.
−
Flatness.
■
Take the weight and dimensions of the machine into account.
■
Check the requirements for ambient conditions:
−
Room temperature.
−
Exposure to sunlight.
−
Purity of the ambient air.
■
Check transport route, e.g.:
−
Gateway openings.
−
Doors.
−
Cable rack heights.
−
Shunting areas around corners.
Electrical system
■
Install electrical connections at the installation site.
■
Lay the conductor cross-section and fuse protection according to the legal
requirements.
Bending tools
Order your initial set of bending tools after consulting with TRUMPF.
Transport
Provide auxiliary transport equipment.
Installation
Operations which must be performed by the service engineer prior to commission-
ing:
■
Transport the machine to the installation site
■
Position the machine correctly and prepare it for anchoring on the ground
■
Position the adjustable legs under the machine
■
Assemble the support bracket
■
Connect the foot switch and network cable
■
Have a qualified electrician connect the machine to the power supply system.
Planning aid
Tab. 2-1
B1161en
Planning aid - Version 1
2
‐
5
Содержание TruBend 2000 Series
Страница 74: ...2 46 Electrical connection Version 1 B1161en...