26
EN
Checking for leaks in the high-pressure section
The screw joints of the high-pressure hose at the gas cylinder valve
and on the gas filter / MonoControl must be checked for leaks, us-
ing suitable means such as a leak-finder spray in accordance with
EN 14291. The operator is responsible for this.
Checking for leaks in the low-pressure section
(maximum test pressure 150 mbar)
The test must be conducted by a technician
The gas hose and gas cylinder must be connected.
– Turn off all consumers.
– Open stop valves and, if present, the gas remote switch.
– Use the Torx T20 (10) from the screw aid (9) to turn the reset button
clockwise to the “not ready for operation” position.
– Remove the screw cap (8) from the test connection and connect
the test pump with test hose to the test connection.