TRUE RESIDENTIAL
®
INS TALL ATION CHECKLIS T
To ensure a proper installation, this checklist should be completed to ensure that no part of the process has
been overlooked.
Has the electrical circuit been verified of using a dedicated 15-amp circuit with the ground plug attached
and correct polarity. Discrepancies in the supplied power can cause serious damage and potentially void
all warranty. Please see page (5) for a more detailed description of electrical guidelines.
Have all the packaging materials been removed? NOTE: please make sure the toe kick which is taped to
the back of the unit is removed prior to pushing the unit in place.
Have the anti-tip brackets been installed securely and are they properly engaging the unit? NOTE: the
location of the anti-tip brackets is taped within the toe kick packaging. For installation instructions please
see page (9).
Is the unit leveled properly with all leveling legs making contact with the floor? Has the toe kick been
installed? Proper leveling should be done from the inside of the unit rather than the top exterior of the unit.
Has the door stop been installed?
Has the customer been given the installation / user guide? NOTE: A lock is standard on stainless steel
units, therefore the key to the lock is taped to the back of the user/install guide. Overlay paneled units will
not come with a lock or key.
Have stainless steel surfaces been inspected for any imperfections? This is to be done by the authorized
True dealer or installer with the customer, upon completion of installation. Stainless steel doors, handles
and shelves are covered by limited 30-day warranty for cosmetic defects.
Is the unit operating properly? If not, is the unit plugged in? Is the breaker on? Is the display illuminated
and say “off”? For all control operations and sequences please refer to “user interface commands on True
Precision control” section in the table of contents per the model of the unit you are installing.
Does the customer understand the unit’s operation?
Make sure the unit is operating and cooling for 24 hours prior to loading with product. NOTE: loading the
unit with some bottles of water will provide assurance the unit is working properly during this 24-hour
time-frame.
Verify all the shelves are securely in place.
Has the Dual Zone wine unit been connected to an external alarm system? Refer to page (6)
2
Содержание TBC-24-A
Страница 3: ...TRUE RESIDENTIAL CONTACT INFORMATION ...
Страница 8: ...THANK YOU FOR YOUR PURCHASE ...
Страница 63: ......
Страница 64: ...CONTACT US www true residential com 636 240 2400 toll free 888 616 8783 SD 12 18 MISC_2175 ...