Linkage Stopper
Washer (2mm)
Washer (2mm)
Nut (2mm)
Set screw (3x4mm)
Washer (2mm)
Set screw (3x4mm)
1
1
1
1
Fuel supply line
Fuel spray line
Air pressure line
Washer (4x8mm)
Washer (4x8mm)
Washer (4x8mm)
Screw (4x35mm)
Screw (4x25mm)
Nut (4mm)
Spring Washer (4mm)
4mm
Set Screw (3x4mm)
Set Screw (2mm)
Rod (2x400mm)
Set Screw (2mm)
Washer (2mm)
Linkage Stopper
1
1
1
1
4
Washer (4x8mm)
4
Screw (4x25mm)
Set Screw (3x4mm)
The sketch map when the engine intall completion
Assembly of the fuel tank
Install the throttle servo
Assemble the throttle servo to the fuselage
Epoxy the plies to fire wall and assemble the
engine mount to them.(see 36 step)
Assemble the accelerator push rod to the engine
39
40
41
38
8
42
43
60mm
90mm
Make sure hinges are
mounted in the same line.
6
Pin hinge(24x24mm)
A
B
A = A '
B = B '
A '
B '
Make sure to glue securely.
If not properly glued, a failure in flight may occur.
Temporarily fasten down the main wing and
check its correct position.
Securely glue together.If coming off during flihts,
you'll lose control of your airplane which leads
to accidents!
Mount the main wing on the fuselage.
Epoxy plies to appropriate position under the belly
parts and drill holes in relevant position .
Epoxy the drop tank to the belly parts with metal wire .
2
2
Blind Nut (6mm)
Screw(6x50mm)
The standard sketch map will be as below when the
horizontal tail install completion.
Aplly instant type CA glue to elevator and pin hinge.
4
Pin hinge(2.5x48mm)
2
Wooden Block(15x15x3mm)
1
Stab joiner(12x267mm)
6.2mm
Blind Nut
6
Pin hinge(24x24mm)
5mm
4
Matal douel (4x30mm)
1
Rib template (3mm ply)
Drill holes the drop tank
22
23
25
24
26
5
Accessory list for the coming installation steps.
5mm
5mm
2
Metal wire (5x30mm)
Metal wire (5x30mm)
10mm
Keep 10mm with betueen the
belly pant and the drop tank