4 - Commissioning

8

4.1 Waterside commissioning

 Fully purge the complete hydronic system of air prior to

commissioning. 

 Carefully inspect the system for leaks, paying particular

attention to the connections.  

 Carefully inspect flexible hose, if applicable, for leaks.

Factory-provided

flexible hose shown (not provided on

all orders).

4.2 Airside commissioning

The primary air flow rate is determined by measuring the static

pressure in the primary air chamber and referring to the calibration

chart label provided on each beam or by calculating the volume by

using the formula and tables in section 4.3.

To measure static pressure: 

  Locate the pressure tap fitted in the nozzle plate at 

the pipe connection end of

the beam (see image).  To

reach the tap, it is not nec-

essary to lower induction

grille, but it can be lowered

if preferred.  Remove cap.

 Attach a measuring gauge

(as shown here):

4.3 Airside commissioning tables 

The primary air volume in CFM can be calculated with this formula:

CFM = K x √ΔP

CFM

primary airflow (CFM)

K

constant - read from tables below

ΔP

static pressure measured in primary air 

chamber (in. W.G.)

DID301-302 Installation, Operation & Maintenance Manual (USA) (06/2015)

Open

pressure

cap

Min. bending radius 

 

3″

2

  

½

Flexible hose 

For water connection ½˝ NPT 

Female swivel thread for

connection to beam

Male fixed thread for

connection pipe header

Important!

Commissioning is to be performed by properly

trained and authorized personnel only!  

!

Important!

Wear eye protection and gloves. 

Product includes sharp edges and burrs.

!

Note

The chilled beam is not provided with any water flow

control or measuring devices, therefore the pipe work

system should be fitted with sufficient balancing aids

to enable adjustment of the flow rate.

Note

Do not attempt to read the total discharge airflow rate

using a hood or any other device that adds down-

stream pressure to the beam, as it will reduce the

amount of induction and give false readings. 
The total air flow (p induced) cannot be

measured.

Note

The constraints detailed in the following tables are

for standard TROX chilled beams.  For chilled beams

with non-standard nozzle configurations, contact

Trox USA.

Table 1: 

Commissioning constraints for DID302

Open cap outlined for 

easier viewing

Beam

Length

A

B

C

Nozzle Type

K

5′

4′

6′

8′

10′

150

9′

7′

59

97

175

69

114

200

79

130

238

93

154

275

108

179

313

123

203

351

138

227

Содержание DID301

Страница 1: ...Installation Operation and Maintenance Manual Active Chilled Beams Type DID301 and DID302 OM US DID301 302 6...

Страница 2: ...ng and venting the water system 7 3 8 Typical installations 7 Commissioning 4 1 Waterside commissioning 8 4 2 Airside commissioning 8 4 3 Airside commissioning tables 8 9 Maintenance 5 1 Cleaning inst...

Страница 3: ...ngs and important notices or information read the complete manual before installation and be familiar with the meaning of the safety symbols in the next section 1 3 1 3 Symbols used in this manual Whe...

Страница 4: ...hoses recommended for water connections from assembly to the supply and return water circuits unless factory furnished flexible hoses are included with product order or hard connections 3 Precautions...

Страница 5: ...direction The unit is provided with sliding hanging brackets that allow for adjustment along the length and width of the beam both shown here Guidelines when using rods Install Unistrut with appropria...

Страница 6: ...he final water connections STEP THREE Make water connections If NPT connections apply do NOT over tighten applying excessive force on the water pipes may damage the heat exchange coil NOTE See section...

Страница 7: ...ontinuous venting is necessary The installation of both manual and automatic venting systems is recommended The pump should only be started when filling is complete To remove all air from the system t...

Страница 8: ...rimary air chamber in W G DID301 302 Installation Operation Maintenance Manual USA 06 2015 Open pressure cap Min bending radius 3 2 Flexible hose For water connection NPT Female swivel thread for conn...

Страница 9: ...e locked position To clean the beam face If necessary the face of the beam and visible painted surfaces can be cleaned using a mild detergent diluted with warm water Apply with a soft cloth rinse and...

Страница 10: ...sign figure Obstruction on induction grille or heat exchanger coil Remove induction grille and inspect clean grille and heat exchanger as necessary Air connection detached from beam Inspect attachment...

Страница 11: ...t any such covered defect or to replace or exchange the Product Customer shall bear all shipping and handling expenses related to the return of the Products Any repaired corrected replaced or exchange...

Страница 12: ...Maintenance Manual USA 06 2015 TROX USA Inc 4305 Settingdown Circle Cumming Georgia 30028 Phone 770 569 1433 Fax 770 569 1435 E Mail trox troxusa com www troxusa com U S Edition 2015 DID301 302 Insta...

Отзывы: