Trox Technik DID301 Скачать руководство пользователя страница 5

5

3 - Installation

DID301-302 Installation, Operation & Maintenance Manual (USA) (06/2015)

3.1  General procedure

Chilled beams should be mounted and connected prior to installing

the suspended ceiling or drywall. The unit should be installed in the

location shown on the design drawings. Deviation from the designed

mounting position should be avoided as the chilled beam location in

relation to the room walls and other chilled beams is critical to the

comfort of the conditioned space. 
The chilled beam leaves the

factory with low tack film

applied to the face (see

photo) to protect the painted

surface.  Film should remain

on beam during installation.

Remove the film before the

air system is started.

3.2  Installation considerations

3.3  Hanging the chilled beam (by Mechanical Contractor)
STEP ONE —

Determine beam locations according to design drawings.

Fix anchors (type dependant on building design and determined

by others) into the structure above the chilled beam mounting

location.  

STEP TWO —

The beam should be suspended 3” above the finished ceiling

elevation using building code approved threaded rods (recom-

mended) or wires.  The rod or wire (both provided by others) allow

the beam’s vertical height to be adjusted so that the beam can be

lowered into the ceiling grid with which it is to be integrated. 
It is recommended that the unit be suspended from 

linear channels

to provide adjustability in every direction.  

The unit is provided with 

sliding hanging brackets

that allow for

adjustment along the length and width of the beam (both shown

here):

Guidelines when using rods

 Install Unistrut with appropriate support to carry

the beam 

  Fasten studs to Unistrut with Unistrut nut in proper

location above the beam’s hanging brackets 

  Adjust beam as needed to final hanging location           

Guidelines when using Wire

 Distribute sliding brackets evenly spaced along the sliding rail on

the plenum box  of the beam

  Wire should be looped through and around the 

inside

of the

bracket

  Wires should run from the bracket straight up or slightly away from

the beam to the anchor location.  

Suspension device requirements

Chilled beams up to 6 ft in length should be supported by a

minimum of four (4) suspension devices. Chilled beams above 6 ft

in length must be supported by a minimum of six (6) suspension

devices.

Installation Example

Sliding Hanging Bracket 

Rail System

Warning!

Each unit must be supported independently from the sus-

pended ceiling. The fixing points should only carry the

weight of the chilled beam. Separate supports should be

provided for adjacent systems components.

Note

It is recommended that chilled beams be installed

using flexible hoses.  

If hard connections are used, the connections

should be made after the chilled beam is

lowered into the ceiling grid and is in its final

position.

Warning!

The hanging wire should NEVER angle across the beam

as it will put undue stress on the sliding bracket and rail.

Return
Supply

Hanging rod

Sliding bracket

(see above also)

Sliding 

brackets

Linear

Channels

Содержание DID301

Страница 1: ...Installation Operation and Maintenance Manual Active Chilled Beams Type DID301 and DID302 OM US DID301 302 6...

Страница 2: ...ng and venting the water system 7 3 8 Typical installations 7 Commissioning 4 1 Waterside commissioning 8 4 2 Airside commissioning 8 4 3 Airside commissioning tables 8 9 Maintenance 5 1 Cleaning inst...

Страница 3: ...ngs and important notices or information read the complete manual before installation and be familiar with the meaning of the safety symbols in the next section 1 3 1 3 Symbols used in this manual Whe...

Страница 4: ...hoses recommended for water connections from assembly to the supply and return water circuits unless factory furnished flexible hoses are included with product order or hard connections 3 Precautions...

Страница 5: ...direction The unit is provided with sliding hanging brackets that allow for adjustment along the length and width of the beam both shown here Guidelines when using rods Install Unistrut with appropria...

Страница 6: ...he final water connections STEP THREE Make water connections If NPT connections apply do NOT over tighten applying excessive force on the water pipes may damage the heat exchange coil NOTE See section...

Страница 7: ...ontinuous venting is necessary The installation of both manual and automatic venting systems is recommended The pump should only be started when filling is complete To remove all air from the system t...

Страница 8: ...rimary air chamber in W G DID301 302 Installation Operation Maintenance Manual USA 06 2015 Open pressure cap Min bending radius 3 2 Flexible hose For water connection NPT Female swivel thread for conn...

Страница 9: ...e locked position To clean the beam face If necessary the face of the beam and visible painted surfaces can be cleaned using a mild detergent diluted with warm water Apply with a soft cloth rinse and...

Страница 10: ...sign figure Obstruction on induction grille or heat exchanger coil Remove induction grille and inspect clean grille and heat exchanger as necessary Air connection detached from beam Inspect attachment...

Страница 11: ...t any such covered defect or to replace or exchange the Product Customer shall bear all shipping and handling expenses related to the return of the Products Any repaired corrected replaced or exchange...

Страница 12: ...Maintenance Manual USA 06 2015 TROX USA Inc 4305 Settingdown Circle Cumming Georgia 30028 Phone 770 569 1433 Fax 770 569 1435 E Mail trox troxusa com www troxusa com U S Edition 2015 DID301 302 Insta...

Отзывы: