1. HANGING SYSTEM INSTALLATION
Outlet Box
Mounting
Bracket
1B. This fan has two installation methods available:
1A.Installing mounting bracket to ceiling outlet box
WARNING: blades should be at least 7 feet from floor
OFF OFF OFF
Turn off power at breaker
box to avoid possible
electrical shock.
Use metal outlet box suitable
for fan support.
Outlet box must support 35 lbs min.
Note 1:
Note 2:
P3
Downrod mount (Standard) : Please follow up Step 1C and 1D.
Flush mount (Hugger) : Please directly go to Step 1E and 1F.
1
2
(See Step 1C and 1D)
(See Step 1E and 1F)
1
2
Downrod mount
Flush mount
1C.
Downrod and Yoke
Installing
Remove cross pin and cotter pin from downrod.
Insert downrod through canopy and yoke cover, and feed motor lead wires through downrod.
Loosen 2 downrod jam screws at yoke. Insert downrod assembly into yoke.
Insert the cross pin through yoke & downrod and secure with cotter pin.
Tighten both downrod jam screws to further secure downrod.
Pull down the yoke cover to cover yoke.
Cross Pin
Cotter Pin
1
2
3
4
5
6
Canopy
Downrod
1
Yoke Cover
3
Downrod Jam
Screw(2)
(
ing)
Loosen
Yoke
Downrod
Assembly
Cross Pin
Yoke
Cotter Pin
Downrod Jam
Screw(2)
(Tightening)
5
4
Yoke Cover
6
Wires
2
1
4
Install mounting bracket to outlet box in ceiling by using screws
included with the outlet box and washers from the hardware bag.