Step 7 Assemble Y-axis Belt Pulley
Parts:
Y Pulley mount (acrylic) – 1pcs
Belt pulley – 1pcs
M5-25mm screw – 1pcs
M5 Nut – 2pcs
M6 washer – 2pcs
M5 washer – 2pcs
M4-8mm screw – 3pcs
M4 T-Nut - 3pcs
Take 1pcs M5-25mm screw and insert the Pulley
mount, secure it with M5 nut , then insert the
washers and belt pulley , secure them using M5
nut.
Secure the Y belt pulley assembly to the front of
the Y slide rail using 3pcs M4-8mm screws and
nuts.
Tighten screws gently to avoid damaging the
acrylic.