CONTENTS
1
SAFETY ....................................................
5
2
EQUIPMENT NEEDED
.................................
6
3
BATTERY INSTALLATION
...........................
6
3.1.
Inspection ...............................................................
6
3.2.
Battery Connections .................................................
7
3.3.
Terminal Types ........................................................
7
3.4.
Correct Hardware Installation....................................
8
3.5.
Cable Size .............................................................
10
3.6.
Torque Values ........................................................
10
3.7.
Terminal Protection .................................................
11
3.8.
Connecting Batteries in Banks .................................
12
3.9.
Ventilation ..............................................................
13
3.10.
Battery Orientation ..................................................
13
3.11.
Battery Environment ...............................................
13
3.12.
Temperature ..........................................................
14
3.13.
Other Installation Considerations.............................
14
4
PREVENTATIVE MAINTENANCE
...............
15
4.1.
Inspection ..............................................................
15
4.2.
Watering (flooded/wet batteries only) .....................
16
4.3.
Cleaning ...............................................................
18
5
CHARGING & EQUALIZING
........................
18
5.1.
Initial Charge .........................................................
18
5.2.
Normal Charging ...................................................
18
5.3.
Equalizing (flooded/wet batteries only) ....................
21
6
STORAGE
...................................................
22
6.1.
Storage in Hot Environments ..................................
22
6.2.
Storage in Cold Environments ................................
23
7
MAXIMIZING THE PERFORMANCE
OF YOUR TROJAN BATTERY
....................
23
8
WHAT TO EXPECT FROM
YOUR TROJAN BATTERY
.........................
24
9
TROUBLESHOOTING
.................................
25
9.1.
Preparation for Testing ..........................................
25
9.2.
Voltage Testing while Charging ..............................
25
9.3.
Specific Gravity (flooded/wet batteries only) ...........
26
9.4.
Open Circuit Voltage Testing ..................................
26
10
BATTERY RECYCLING
..............................
27
11
BATTERY ABBREVIATIONS
......................
28
Содержание SOLAR INDUSTRIAL Series
Страница 1: ...SOLAR INDUSTRIAL LINE USER S GUIDE...
Страница 29: ...U S E R S G U I D E 29 Notes...
Страница 30: ...T R O J A N B A T T E R Y 30 Notes...
Страница 31: ...U S E R S G U I D E 31 Notes...