9
STEP 6: (Mounting the POWER UNIT)
1.
Attach the power unit to the POWERSIDE COLUMN using bolts, nuts and washers supplied (Fig. 10).
2.
Remove the vent plug from the power unit and fill the reservoir with
hydraulic oil. Make sure the funnel used to fill the power unit is clean.
Suggestion: Use AW 32, or 46 Non-Detergent Non-Foaming Anti-Wear
Hydraulic Oil SAE-10 or Automotaic Transmission Fluid.
The Unit will hold approximately eleven quarts of fluid.
Fig. 10
STEP 7: (Routing the EQUALIZER CABLES)
1.
Raise and lock each carriage on the first safety latch engagement. It is approximately 30” high.
2.
Make sure that the safety locks on each column are fully engaged before attempting to route equalizer
cables.
3.
Be sure each carriage is at the same height by measuring from the top of the base to the bottom of the
carriage. This difference should be within 1/4”.
4.
Route the first cable. (See Figs. 11-13) Screw the nut on the cable stud so that half thread pass through the
nut. Pull the other end of the cable and screw the nut on it also. Then tighten both nuts.
Fig. 11
Fig. 12
Call 866-563-5438 For Help
9
TRIUPMH AUTO LIFTS
TRIUPMH AUTO LIFTS
TRIUPMH AUTO LIFTS