5
STEP 1
Attach the
P4
Bottom Goal Tray onto the
P5
Top Goal Box using
H1
Screws.
Attach the
P5
Goal Box onto the
P2
Air Hockey Mainframe using pilot holes and
H2
Screws.
Tighten, but DO NOT strip out screws.
ON/ OFF Switch for Air Fan
Hook and loop strap
for Fan Cord storage
P2
P5
H1
H2
P4
Pilot holes
P5
FIGURE 1
THE POP UP LEG ASSEMBLY HAS 6 FLAT TOPS
THAT THE 6 DOCKING PORTS UNDER THE AIR
HOCKEY MAIN FRAME WILL SET DOWN ONTO
Note: Air Hockey Mainframe can remain in the
carton for this assembly or any clean flat surface.
Docking Ports
Flush This Side
CAUTION
LABEL
Note: When flipping this main cabinet
DO NOT lift on either Puck Catcher
Helpful hint: Read and study STEP 2 then carefully expand the Pop Up Leg assembly and place
it into the 6 Docking Ports while the P2 Main Cabinet is upside down. This will help you get the
Pop Up Leg Assembly sized correctly. Then proceed to STEP 2 and 3.