Installation

GENERAL CONSIDERATIONS FOR ALL 

DISINFECTION UNITS:

1.  When installing the equipment, it is necessary that 

the unit be isolated from vibration, heavy equipment, and 

poorly connected piping.
2.  Incoming water temperature to the unit should not 

exceed 35° minimum to 110° maximum degrees Fahrenheit.
3.  The operating pressure should not exceed 100 psi.
4.  Before  putting  the  unit  into  final  operation  follow 

sanitation procedures as outlined in this manual for proper 

disinfection.  Sanitizing  all discharge piping and fittings 

with household  bleach from disinfection unit to point of 

use removes existing contaminants and gives the unit a 

“clean start.”  Be sure to rinse with U.V. treated water.
5.  A proper flow control, included with the unit, must be 

used to insure only the designated flow through the unit.  

GENERAL PRECAUTIONS TO BE FOLLOWED 

AT ALL TIMES:
1.  Always disconnect electrical power to any U.V. unit 

before servicing.
2.  Under no circumstances should personnel look at a 

U.V.  lamp  in  operation  (EXCEPT  through  an  external 

sight Port lens located on the outside of the unit).
3.  U.V. disinfection units must always be properly grounded. 

The TRI series are always placed after the pressure tank and 

any other type of treatment devices (i.e. softeners, filters).
These units are normally installed in a vertical position in 

an enclosed area with good ventilation.  Allow clearance of 

at least the unit’s length at one end for quartz sleeve and 

lamp replacement.  Two (2) anchor bolt holes are provided 

for proper wall support.  Use wall plugs with screws for 

sufficient support (not included).  A lock nut secures the 

mounting bracket to the U.V. chamber.
If your piping system is subject to impulse pressure resulting 

in a “water hammer” condition, a surge tank or other means 

must be provided to remove this condition; otherwise, this 

extreme shock pressure condition may rupture or fracture 

the quartz sleeve.
Make all plumbing connections to allow for ease of service.  

Be sure to follow all local plumbing codes and U.V. 

restriction requirements where specified by local authorities.

STEP BY STEP INSTALLATION:
1. Turn off the water before cutting into the water line.
2. Assess the installation (i.e. type of pipe, size of lines, 

etc.) and obtain necessary plumbing fittings for installation.  

Inlets and outlets on TRI units are 3/4” FNPT and 1” 

MNPT.  Use Teflon tape on all threaded connections and 

avoid over tightening.
Note: The flow control is a press in type.  Each unit has a 

3/4” FNPT and 1” MNPT inlet/outlet machined so the 

flow control can be easily inserted into the bottom port 

inlet.  Make sure the rubber part of the flow control is 

facing outward from the bottom inlet.  Simply hand press 

or slightly tap in the flow control until it sits on the inside 

ledge of the machined bottom inlet.  
3. Using the mounting bracket provided, secure unit to 

wall, or other surface.  Make sure to allow enough room 

to install, replace, and clean the quartz sleeve and lamp.  

Installing a water shut-off valve before and after the unit is 

recommended to make servicing easy.
4. After mounting, install quartz sleeve, O-Ring, and lamp 

per instructions.  Turn on the water slowly, check for leaks, 

and repair as needed prior to full service operation.
5. After the unit is full of water, plug it into a grounded 

110V outlet.  Observe operation through the safety sight 

Port.    The  lamp  will  show  a  bright  blue  glow.    If  any 

problems are noted, consult trouble shooting guide.

Содержание Purificare TRI Series

Страница 1: ...Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product TRI Series Ultraviolet Disinfection Systems MODELS TRI 8 TRI 12 TRI 20 Revised 6 2015 ENHANCED D...

Страница 2: ...Purificare 2015 2...

Страница 3: ...Installation 6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 16 Wiring Diagram 17 Troubleshootin...

Страница 4: ...r distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system where it wil...

Страница 5: ...be required if these parameters cannot be maintained Flow rate must not exceed rated capacity of the unit The TRI series has an unique design with an ultraviolet germicidal lamp housed within a single...

Страница 6: ...he mounting bracket to the U V chamber If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to remove this condition...

Страница 7: ...Purificare 2015 7 Installation Diagram...

Страница 8: ...control box into a 120volt wall plug outlet 3 Upon start up the UV lamp Detector and Timer circuit board will perform a self diagnostic test When power is applied the circuit board will perform an out...

Страница 9: ...Purificare 2015 9 Sample Screen Shots fig 1 fig 1A fig 1C fig 1B fig 1D fig 3 fig 3A fig 4 fig 5 fig 5A fig 6 fig 2 fig 2A LAMP LIFE LOW CALL DEALER SNOOZE...

Страница 10: ...ned to use Water in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and...

Страница 11: ...inate or filter and disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a prefilter with sump may serve as a source to sanitize the water...

Страница 12: ...p and electrical connection Then remove brass end nut Install the quartz sleeve through the stainless steel threaded nipple until it is centered in the Quartz spring Use a small amount of plumber s gr...

Страница 13: ...Purificare 2015 13 Lamp Installation FIG 1 FIG 2 FIG 3...

Страница 14: ...OM 9 7 6 2 1 11 10 3 5 4 8 14 13 12 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 476D Domed Quartz 1 2 ATS4 450 UV Lamp 1 3 ATS 268 Top Mounting Bracket 1 4 ATS 5172 Sightport Lens 1 5 ATS 5173 Orange 7...

Страница 15: ...CES FRACTIONAL 25 TWO PLACE DECIMAL 010 THREE PLACE DECIMAL 002 UNLESS OTHERWISE SPECIFIED 6 18 15 A PFC 12 CUSTOMER BOM 6 8 1 3 5 2 10 7 9 4 11 14 12 13 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS1 759...

Страница 16: ...TOME 8 6 2 1 3 5 7 9 4 14 10 13 11 12 ITEM NO PART NUMBER DESCRIPTION QTY 1 ATS 832D Domed Quartz 1 2 ATS4 810 UV Lamp 1 3 ATS 5172 Sightport Lens 1 4 ATS 5173 Orange 7 OD Viewport O Ring 1 5 ATS 5171...

Страница 17: ...Purificare 2015 17 Circuit Board Layout...

Страница 18: ...ID J7 Ballast Power Display Backlight Touch Black White Green Red White Green White Blue Blue Yellow Yellow Red Red 2 1 2 1 J8 Ballast Status 2 1 Ballast Red Yellow 1 2 1 2 3 Blue Brown J6 Green Wire...

Страница 19: ...r or above 120 volts Line cord disconnected Check replace or outlet defective Defective U V lamp Replace Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace out a...

Страница 20: ...inutes 3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination o...

Страница 21: ...Parts Breakdown 1 Mounting Bracket 2 Outlet 3 Sight Port 4 Quartz Sleeve 5 UV Lamp 6 Inlet 7 Quartz Sleeve Stabilizer 8 Optional Bottom Mounting Bracket 1 2 6 7 4 3 5 8 1 MNPT Flow Control 3 4 FNPT O...

Страница 22: ...Purificare 2015 22 Notes...

Страница 23: ...Purificare 2015 23 Notes...

Страница 24: ...the suitability of the product for his her intended purposes and shall assume all risk and liability in connection therewith RETURNS A RETURN MERCHANDISE AUTHORIZATION NUMBER RMA is required on ALL R...

Отзывы: