Bewitch
Valve spindle
At this stage, temporarily fit the cover in order to
carry out the commissioning procedure.
The first operation of the shower is intended
to flush out any remaining unit debris and to
ensure the heater unit contains water before the
elements are switched on.
Refit the trimplate and secure with the two
screws.
Turn the valve spindle fully clockwise until the
arm hits the stop
(fig.)
.
Turn the temperature control on the cover
clockwise to 11 o’clock, the minimum flow
position
(fig.)
.
Offer the cover to the unit.
ImporTAnT:
Do not connect the 10-way
ribbon cable at this stage.
Carefully locate the cover tags into the guide
pockets on the backplate and ensure wires
are not trapped. Guide into position so that
the control spindle locates correctly (minor
adjustment may be necessary to align the
control and spindle). Should any difficulty arise,
recheck the points above.
Whilst applying slight pressure to the front
cover, secure in position with the three retaining
screws.
Fit the flexible hose to the shower outlet making
sure the outlet of the hose is directed to waste.
Make sure the supplied sealing washer is in
place. DO NOT attach the showerhead at this
stage.
Before turning on the electric and mains water
supplies to the shower, make sure that the
temperature control is rotated fully clockwise to
the minimum flow position
(fig.9)
.
note:
Failure to rotate fully clockwise may cause
the PRD to operate.
Fig.
Fig.
WArnInG!
Before normal operation of the
shower, it is essential the following
commissioning procedure is
completed correctly.
Commissioning
COMMISSIONING
Temperature
control set at
maximum flow
setting