Triple Solar assembly instruction PVT heat pump panels March 2020
5. Preparation for pitched roof, tiled roof
Attention:
See also the Wagner assembly instruction film on the Triple Solar website.
Aligning panels and installing roof brackets
Each panel is supported by two horizontal mounting rails. These are positioned parallel to each other,
see figure 5.1-a. It is recommended to plan the configuration of panels, pipes and hoses before starting
the installation.
Four roof brackets are required per panel. 2 Screws are included per roof bracket; 7,0x50 stainless steel
Attention:
The dimensions in figure 5.1-a are critical. If they are not respected, the warranty on the panels
will be invalid.
•
Start with the lower rail of the lower row of panels. Place the outermost roof bracket at 450 mm
from the edge of the panel field. Spread the rest of the roof brackets evenly with 1000 mm
distance between them. Maximum distance is 1600mm depending on the size of the field, see
figure 5.1-b.
Figure 5.1-a sloping roof alignment diagram (dimensions in mm) The lengths can differ per type of panel.