background image

www.trin

Loweri

To lower
complete

1.  R

C

2.  M

u
d
1

3.  W

co
B
th
F
n

Latc

ityhighway.c

ing the M

r the MPS 

e the followin

Warn

opera
opera

Warn

the La

WINC

or dea

Warn

other 
opera

Remove Linc
Clip. Place th

Manually dise

ntil the Latc
own on the 
8). 

While pressin

ontrol switch

Bar Arms, yo

he Controlle

rame Assem

ot be in tens

Warn

Assem
adjust

Control Sw

h Bar Handl

com  

MPS 350

®

 

350

®

 X fro

ng steps: 

ning:

  Ensu

tion. Failure
tor and/or by

ning:

  Ensu

atch Bar Ass

CH STRAP IS

ath to operat

ning:

    Do  n

loose acce

tion.  

chpin and rel

he Linchpin b

engage the 

ch Bar Arm

Latch Bar H

ng down on t

h. Once the

ou can relea

er Switch un

mbly’s weigh
sion. 

ning:

    The

mbly’s weigh

ted. Failure t

witch 

2

om the UP

re that no o

e to follow th

ystanders. 

re that the W

sembly. 

NEV

S SLACK.

 F

tor and/or by

ot operate t

essories, wh

lease Chain

back in the C

Latch Bar A

s clear the 

Handle while

the Latch Ba

 Frame Ass

ase the Latc

ntil the Botto

ht shall rest 

e MPS 350

ht rests on t

to follow this

21

(vertical) po

one is near, 
his warning c

Winch Strap

VER RELEA

Failure to fol

ystanders. 

the MPS 35

hich may be

s from Chai

Chain Retain

Assembly  b

Frame Cro

e operating 

ar Handle, o

sembly has 

h Bar Hand

om Limit Sw

fully on the

Figure 18

0

®

 X must 

he Support 

s warning co

osition to th

under, or b

could result 

p is tight and

ASE THE LA

low the warn

50

®

 X while

ecome tang

n Retainer T

ner Tab. 

by pressing 

oss-member

the Control

operate the W

started lowe
le. Continue

witch diseng

e Support Ch

be lowere

Chains or t

ould result in

Revision C

he DOWN (

behind the M

in serious i

d without sl

ATCH BAR 

ning could re

wearing loo

led in the M

Tabs by unlo

down on th

r completely

 Switch (see

Winch by pre

ering and ha

e pressing th

gages powe

hains and th

 

ed complete

he Bottom L

n damage to 

C December

(horizontal) 

MPS 350

®

 X

njury or dea

ack before r

ASSEMBLY

esult in serio

ose fitting cl

MPS 350

®

ocking the e

he Latch Ba

y. Continue 

e Step 3 an

essing DOW

as cleared t

he DOWN b

r to the Win

he Winch St

ely until the

Limit Switch 

the Winch m

2017

 

position, 

X when in 

ath to the 

releasing 

Y IF THE 

ous injury 

othing or 

X during 

end of the 

r Handle 

pressing 

nd Figure 

WN on the 

the Latch 

button on 

nch. The 

trap shall 

e Frame 

must be 

motor. 

Содержание MPS 350X

Страница 1: ......

Страница 2: ...ay Program ct Desc mbly M Stemmons F as Texas 75 ctions are t repair of M cified by the bly mainten arameters c een deemed y system un available fo rker oversee ity Highway supersede s in this Ma way...

Страница 3: ...ystem 17 Maintenance 19 Recommended Routine Maintenance 19 Winch System Operation 20 Lowering the MPS 350 X 21 Raising the MPS 350 X 22 Chain Retainer 23 Removing the MPS 350 X From the Truck 23 When...

Страница 4: ...lterations perform as NOT use a proved for thi 3 level of cust supporting d ained from th 888 323 1 214 5 product inf www trinity 800 772 800 527 800 282 800 321 800 835 s tem is critic NCHRP Rep embl...

Страница 5: ...the 4 by the app edge of how bly mainten above These et them as w he assembly tructions tho s before ass low this war t further com ate instructi he product of the MPS thin the MP could resul ere it i...

Страница 6: ...corpor hority must ollow this wa The traffic erved in utili y Highway maintaining gle parts fro systems Su gible for use ories is strict y or death he MPS 350 MPS 350 ncy and loca r assembly TCD and l...

Страница 7: ...300 lbs as specified by The Highways Agency A product can be certified for various speed levels as shown below TL3 UK 110 km h 68 mph Highways Agency directed tests are not intended to represent the p...

Страница 8: ...port the ivel Jacks in ot use hand Always kee vities e that no on 7 shall stand a g parts ck In the DO o 13 from t he DOWN an impacting tion Figure MPS 350 nto the stor Figure s or feet to ep feet cle...

Страница 9: ...g pos Linchpin Chain S 8 X system is i nything on t part of the T A the opera nderstand th MA when at storing the T ains using t ar before rai on and retai Never allow ing lowered o and from a sition...

Страница 10: ...5 traps could b Figure 5 for the truck sts etc system be intended im nes see p 1 operating the njury and or Figure 6 making turn he end of the e Winch Str ng used as t maged and is often e system is i...

Страница 11: ...t 46 m 150 ft 53 m 175 ft 80 88 50 55 15 m 50 ft 23 m 75 ft 30 m 100 ft 46 m 150 ft 72 45 15 m 50 ft 23 m 75 ft 23 m 75 ft 30 m 100 ft Note Distances are applicable for shadow vehicle speeds up to 25...

Страница 12: ...e structu ure durable e truck or TM ble and acc ity please guidance T erns that hav ts Before as pplied with t AW or SMAW w 6 extens 1 1 8 1 1 6 1 1 8 1 2 cil soap ston ersonal prote is a genera speci...

Страница 13: ...essories wh 2 PS 350 X the MPS 35 from the re Highway ab before opera protective m y componen s Hardware e box and 620358 on p ach the thre our 4 3 8 W ng pallet usin Figure 8 nd 350 X is go ovement D...

Страница 14: ...nt of the She act Failure t X your applicat 1 2 13 mm ure 10 below MPS 350 X of clearance and the Mo sing the C truck frame ger followin attachment Figure 10 ivot Bolt mm of the truck 36 1 2 mm to th...

Страница 15: ...ior to the truck e Impact Fa gure 12 Ro e Figure 2 o Figure 11 2 AWG m ed truck bat ws easy att uting of the c e optional Ca protection t with a 200 a n the unit s trap until it is the 1 25 he two Cro...

Страница 16: ...a sed p MUST of the 1 Winch Strap o m to ensure Nose and St own in draw ction Box o ower channe ng color code and ID Lamp and Hazard d Hazard and ID Lamp 5 Figure 12 Figure 13 on the MPS proper funct...

Страница 17: ...the C ain Retainer or the Chain 6 MPS 350 nd 34 ertical posit he Frame As er see Figu nch will autom Figure 15 ical position Chain betwee r Tabs and C on the othe Figure 16 X Use dra tion until the s...

Страница 18: ...an E al position T tem as the t om inside th the button ressing the for extended und if the TM the truck s ver possible s in the DOW side the cab c conditions it is in the ra ide of the T e TMA Fram...

Страница 19: ...n eac OWN until the ning Chain i disengage with the optio when the DO hes the full ctivates the ne is near 0 X must he Support th to the ope res incorpo thority must control plan izing this pro ch set...

Страница 20: ...s at t Mounting B Latch Bar As for damage rkings on Imp rning decals g hardware ed and Plugs ttachment ha achment Pla e Check fo Support Stru f Shear Bolt cure everity of us ommends in ermined by unti...

Страница 21: ...0 or close pro al activity esponders 350 X Do uck The Po d clearance head obstru could cause death T TO MANU follow this w ders MPS 350 X isconnect S can be conne s the operat Figure 17 te Cab Con ver...

Страница 22: ...is warning c Winch Strap VER RELEA Failure to fol ystanders the MPS 35 hich may be s from Chai Chain Retain Assembly b Frame Cro e operating ar Handle o sembly has h Bar Hand om Limit Sw fully on the...

Страница 23: ...Winch ol Switch to o ir of Coil Sp Frame Assem into place mit Switch sh 22 ble for the M n see p 3 vertical posi se the MPS may result i operate the prings locate mbly The F Once the F ould disenga F...

Страница 24: ...en the Chain d Chain to secure in for the secon X From ith three 3 m the truck X from the at level grou at the MPS the ignition RT ENGINE s are discon is in the DO al position three 3 Jac wer the Jac...

Страница 25: ...o slightly ro sier with two n of the bol moved Tigh e remaining olt in the corr ate to the sto nity Highwa e system is sibility of t t this produ provided in 24 pacted ort 350 crite ed in the She ownw...

Страница 26: ...truck eplaced and one that stro PS 350 X ust be replac laced e that stroke ved from the d Bracket As ed ase contact 3 25 s less than 4 e front of the of the Beam following ste 07412B from then remov d...

Страница 27: ...not operate for 5 seconds After 5 seconds the system will reset itself While the truck is running use a DC voltmeter to ensure the voltage does not drop under the minimum value during operation under...

Страница 28: ...www trin DWG 620131 1 of 2 ityhighway c com 2 27 Revision C C December 2017 FRAME ASSEMBLY MPS 350 X...

Страница 29: ...www trin DWG 620131 2 of 2 ityhighway c com 2 28 Revision C C December 2017...

Страница 30: ...www trin DWG 620150 1 of 2 ityhighway c com 2 29 Revision C C December 2017 HOIST ASSEMBLY MPS 350 X 12V...

Страница 31: ...www trin DWG 620150 2 of 2 ityhighway c com 3 30 Revision C C December 2017...

Страница 32: ...www trin DWG 620358 ityhighway c com 3 31 Revision C C December 2017 MISC HARDWARE MPS 350 X...

Страница 33: ...www trin DWG 620139 1 of 3 ityhighway c com 3 32 Revision C C December 2017 LIGHT ASSEMBLY MPS 350 X...

Страница 34: ...www trin DWG 620139 2 of 3 ityhighway c com 3 33 Revision C C December 2017...

Страница 35: ...www trin DWG 620139 3 of 3 ityhighway c com 3 34 Revision C C December 2017...

Страница 36: ...www trin DWG 620344 1 of 2 ityhighway c com 3 35 Revision C C December 2017 STRIPING ASSEMBLY MPS 350 X Please use the chevron or striping as set forth by each highway authority...

Страница 37: ...www trin DWG 620344 2 of 2 ityhighway c com 3 36 Revision C C December 2017...

Страница 38: ...www trin DWG 616797 ityhighway c com 3 37 Revision C C December 2017 UNDERRIDE ASSEMBLY RECEIVER TMA...

Страница 39: ...www trin DWG 620367 ityhighway c com 3 38 Revision C C December 2017 ATTACHMENT ASSEMBLY MPS 350 X...

Страница 40: ...www trin DWG 620479 ityhighway c com 3 39 Revision C C December 2017 CAB CONTROL ASSEMBLY MPS 12V...

Страница 41: ...www trinityhighway com 40 Revision C December 2017 Notes...

Страница 42: ......

Отзывы: