![Triner Scale TSM Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/triner-scale/tsm-series/tsm-series_setup-manual_1163162017.webp)
Set Up Guide | Floor Scale
15
APPENDIX B: PARTS LIST
Part Description
Part Number
Four load cell steel NEMA 4x junction
box assembly with signal trim summing
card
JBOX
1/2 –20 precision ball and cup leveling
foot
FOOT07
2.5k (2,500 lb) Sheerbeam load cell
LC002
5k (5,000 lb) Sheerbeam load cell
LC004
Load cell Bolt M12 x 1.75 x 50mm
LCB01
Load cell Bolt
½
-20 x 1
¾
LCB02
Eye Bolt M12
M12EB
Leveling foot retaining plate, 3”
RTP
Top access plate screw M8 x 1.25
TPS01