System Initialization
– Start-up
Note: Please
double check the connections (notably AC & DC)
before operation.
Power on the BESS system per the following steps:
1. After changing all the setting.
Restart the system
by turning off all AC & DC circuit breakers
(no particular order)
2. Turn
ON PV array
isolators/circuit breakers (if applicable)
3. Turn
ON AC circuit breaker
between Power Box Grid port & Grid. The Power Box should start
to operate now.
4. Turn
ON all the battery packs
by pressing any one of the red softstart button on the pack
5. Turn
ON DC circuit breaker/isolator
between PowerCube 2.0 & Power Box (Only when you
see inverter LCD screen shows
“Wait”
which indicate success start-up)
6. Turn
ON some home appliances or load
. Make sure power consumption in the Power Box’s
phase is greater than 200W.
7. You should be able to
read the data on the screen
.
Содержание PowerCube 2.0 DC
Страница 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Страница 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Страница 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Страница 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Страница 8: ...8 Battery Packs...
Страница 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Страница 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Страница 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Страница 29: ...29 BESS installation Complete Note Sample Installation for reference...
Страница 39: ...WIFI Monitoring Setup Guide 04 Establish WLAN Wi Fi Connection APP Setup BESS System Monitoring...
Страница 45: ......