30
System Initialization
– Changing settings
Note: Please
double check the connections (notably AC &
DC)
before operation.
Power on the BESS system per the following steps:
1. Turn
ON PV array
isolators/circuit breakers (if applicable)
2. Turn
ON AC circuit breaker
between Power Box Grid
port & Grid. The Power Box should start to operate now.
You should be able to see the LCD display powered on.
3. Change the
inverter parameters
to the
correct
settings
(next few slides)
Содержание PowerCube 2.0 DC
Страница 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Страница 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Страница 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Страница 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Страница 8: ...8 Battery Packs...
Страница 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Страница 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Страница 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Страница 29: ...29 BESS installation Complete Note Sample Installation for reference...
Страница 39: ...WIFI Monitoring Setup Guide 04 Establish WLAN Wi Fi Connection APP Setup BESS System Monitoring...
Страница 45: ......