Installation Accessories
Depending on the site-specific situation and local electrical compliance requirements, some if not all of
the following parts will be required:
•
AC circuit breakers
– Minimum
four 32A circuit breaker
is required next to the BESS system and
inside the main switchboard. Additional ones for extended distance away from
switchboard/distribution board
•
AC cables (≥4mm
2
)
– From powerbox to Switchboard/Distribution board & critical loads
•
DC cables (≥25mm
2
)
– From powercube to powerbox (2 to 5 metres)
•
Ethernet/CAT5 cables
– To extend the
communication cable
, distance between the powercube
and the powerbox. Or to extend the
Energy meter communication cables
.
•
Conduits
– 20mm
Содержание PowerCube 2.0 DC
Страница 1: ...PowerCube 2 0 DC Installation Guide Australia New Zealand Feb 2018 V1 5...
Страница 3: ...System Introduction 01 System Topology Power Box DC PowerCube 2 0...
Страница 5: ...5 Power Box DC Bess Hybrid Inverter Length 610mm Width 515mm Height 192mm Weight 30kg...
Страница 7: ...Upacking the products 02 Battery Packs PowerCube 2 0 Casing Power Box...
Страница 8: ...8 Battery Packs...
Страница 12: ...12 Installation Tools Hammer Drill Recommend drill dia 8 10mm...
Страница 14: ...14 System Connection Single Line Diagram TB5200SH internal wiring diagram...
Страница 22: ...22 System connection Battery Modules 4 Packs Connection Wire Master Energy Meter...
Страница 29: ...29 BESS installation Complete Note Sample Installation for reference...
Страница 39: ...WIFI Monitoring Setup Guide 04 Establish WLAN Wi Fi Connection APP Setup BESS System Monitoring...
Страница 45: ......