SECONDARY TRANSPORTATION

 

The packaged modules can be transported by land, sea or air. During transportation, make sure that 
the package is fixed with packing belts securely on the shipping platform without any movement. 

If  the  unpacked  modules  need  to  be  transported  to  other  places,  it  is  recommended  to  pack  the 
single module together in a package to the maximum number allowed, and fixed with inner packing 
belts (2100N force recommended). Finally, cover it with the packaging carton box and fix it with the 
same number of packing belts as before.

 

 

If the number of modules need to be packed is less than the maximum number allowed in a package, 
the modules need to be fixed and secured to the center of the pallet for utility packaging (the following 
figure to the left) or on the side for distribution packaging (the following figure to the right), and fixed 
with inner packing belts (2100N force recommended). Finally, cover it with the packaging carton box 
and fix it with the same number of packing belts as before. Do not put the unfulfilled package on the 
lower layer when transported. 

 

 

 

 

 

 

Please use appropriate means of transport to transport the modules. Do 
not use pedicab to transport or handle the modules. 

Secondary  transport  is  not  allowed  for  the  monofacial  modules  that  are 
packaged horizontally. 

There  is  no  stacking  of  pallets  allowed  (for  both  vertical  landscape  and 
vertical portrait packages), when transporting with small trucks. Please fix 
the  package  to  the  vehicle  using  e.g.  ropes  and  control  the  driving  speed  according  to  the  road 
conditions. 

When using box trucker and flatbed trucker transport the modules, the module packages should be 
placed  close  to  each  other  without  any  gap.  The  empty  space  needs  to  be  filled  to  prevent  the 
package moving backwards to the rear of the truck. Additionally, the package needs to be fixed using 
e.g. ropes to the vehicle when transporting with the flatbed trucker. 

Do not allow pallets to exceed the loading area of the transport vehicle.    

STORAGE 

Modules should be stored in a dry and ventilated environment on a flat ground, to avoid damage or 
dumping of the modules due to ground deformation or collapse.  

Storage requirements: relative humidity < 85% and temperature range of -40°C to 50°C. 

 

Do not remove the original package and keep the wrapping film and carton 
box in a good condition, if the modules require long-distance transport or 
long-term storage. 

For  long-term  storage,  it  is  recommended  to  store  the  modules  in  a 
standard warehouse with regular inspection, and under confirming of your 
personal safety, reinforce the package in a timely manner if any anomalies 
are found. 

Содержание 210 Vertex Series

Страница 1: ......

Страница 2: ...DE18M 08 II DE19 DE20 DE21 Bifacial products DEG18MC 20 II DEG19C 20 DEG20C 20 DEG21C 20 Contents of this document are subject to change without notice For the latest document please refer to Trina S...

Страница 3: ...INSTALLATION SAFETY 11 6 2 INSTALLATION METHOD 13 6 2 1 SCREW INSTALLATION 13 6 2 2 CLAMP INSTALLATION 14 6 2 3 SINGLE AXIS INSTALLATION 18 6 3 GROUNDING 19 6 4 ELECTRICAL INSTALLATION 20 6 4 1 SAFET...

Страница 4: ...manual Warning Otherwise the product may be damaged or the user s personal safety may be endangered Prohibition Otherwise the product may be damaged or the user s personal safety may be endangered 2...

Страница 5: ...em Do not artificially concentrate sunlight on the module Do not drop PV modules or allow objects to hit or fall directly on the modules Do not carry modules on your head Do not carry modules with rop...

Страница 6: ...is a risk of corrosion if the module is placed in a salt spray i e a marine environment or in an environment containing sulfur e g volcanoes etc In the place 50 500 m away from the sea stainless steel...

Страница 7: ...ing to the weight and size of the module Please adjust the position of the sling to keep the modules steady To ensure the safety of the module wooden sticks boards or other fixtures of the same width...

Страница 8: ...river it is recommended to drive backwards during the forklift and arrange for special supervision and command to prevent bumping into people or items causing personal injury or damage to the modules...

Страница 9: ...dary transport is not allowed for the monofacial modules that are packaged horizontally There is no stacking of pallets allowed for both vertical landscape and vertical portrait packages when transpor...

Страница 10: ...cm 5 UNPACKING INTRODUCTION 5 1 UNPACKING SAFETY Before unpacking please check the product type power bins serial number and relevant suggestions on the A4 paper of the packaging box and read the unpa...

Страница 11: ...ter of gravity and are prohibited from unpacking on non horizontal or soft grounds to avoid personal injury or even death If unpacking the vertical portrait packages on non horizontal ground anti tilt...

Страница 12: ...struction can be seen on the packing box 4 Cut the two packing belts on the short side of the pallet and cut the side carton in the vertical direction 5 Cut off the short side tape lift the cardboard...

Страница 13: ...e side cover 4 Take out the modules from one side 1 Remove the wrapping film and packing belts 2 Remove the top cover and sealing tape 3 Remove the carton box 4 Place the stand supporter from the glas...

Страница 14: ...s or connectors etc If any of such situation is found please contact Trina Solar customer service in time Before installation please keep modules electrical components clean and dry Connectors can cor...

Страница 15: ...nstallation During installation and wiring of PV modules please use opaque material to cover the PV module surface completely Installation work must be carried out by at least two persons Do not stand...

Страница 16: ...s and or the professional engineers For detailed information please follow local structural code or contact your professional structural engineer The modules shall be mounted on continuous rails that...

Страница 17: ...s modules with a number of clamps from different manufacturers it is recommended to use fixing bolt of at least M8 The clamp should have length of 50 mm 1 97 inch with thickness of 3 mm 0 12 inch The...

Страница 18: ...g rails run perpendicular to the long side frame Use 4 clamps on the long side Mounting rails run parallel to the long side frame DE09 DE09 05 DE09 08 A 250 350 mm Uplift load 4000 Pa Downforce load 6...

Страница 19: ...M 08 II A 0 200 mm Uplift load 1000 Pa Downforce load 1200 Pa DE18M II DE18M 08 II DEG18MC 20 II A 0 200 mm Uplift load 1000 Pa Downforce load 1300 Pa DEG18MC 20 II A 0 200 mm Uplift load 1000 Pa Down...

Страница 20: ...200 mm Uplift load 1800 Pa Downforce load 1800 Pa DE18M II DE18M 08 II A 250 450 mm B 100 250 mm Uplift load 1000 Pa Downforce load 1200 Pa DEG18MC 20 II A 250 450 mm B 100 250 mm Uplift load 1000 Pa...

Страница 21: ...roduced by different manufacturers please check Appendix A for details If the tracker is provided with a bumper and hold hoop they should be tightening together onto the torque using a hex driver Plea...

Страница 22: ...a Solar s modules The grounding device should be installed in accordance with the operating manual prescribed by the manufacturer Trina Solar recommends using grounding wires with resistances that are...

Страница 23: ...es installed in the system In order to ensure this the open circuit voltage of an array needs to be calculated at the lowest expected local ambient temperature which can be determined using the follow...

Страница 24: ...Otherwise during the operation of the modules this could lead to electric arc due to poor connections and can burn the connectors Before the commissioning and operation of the power station please che...

Страница 25: ...ot responsible for determining the minimum rating of fuse The fuse rated current should be chosen depending on different standards as follows 1 5 1 56 where Fuse rated current A Short circuit current...

Страница 26: ...rent losses Before cleaning make sure to wear PPE such as insulated protective gloves protective glasses hard hats safety insulated shoes etc When using scaffolding make sure that the scaffolding is i...

Страница 27: ...hen cleaning the back of the bifacial module avoid any sharp objects that may cause damage or penetrate the base material The other cleaning requirements are the same as the front side Cleaning activi...

Страница 28: ...ucted with non conductive materials to minimize risk of electric shock and that they are not abrasive to the glass or the aluminum frame If grease is present an environmentally friendly cleaning agent...

Страница 29: ...trinasolar com and one of our technical service representatives will contact you within 5 business days A username and password is required to send feedback from the customer service link For module s...

Страница 30: ...20 Array Technologies Inc DuraTrack HZ v3 400 mm purlin Uplift load 1600 Pa Downforce load 1600 Pa DEG18MC 20 II DEG19C 20 Array Technologies Inc DuraTrack HZ v3 600 mm purlin Uplift load 2400 Pa Down...

Страница 31: ......

Отзывы: