background image

 

 

 

Installation_Guide_SecureMesh_GATE-1000_110502.docx 

SecureMesh™ Gateway 
GATE-1000

 

INSTALLATION GUIDE 

  

 

 

 

Contents  

INTRODUCTION ............................................................................................................................................................................ 3

S

ECURE

M

ESH 

G

ATEWAY 

C

OMPONENTS

 .......................................................................................................................................................... 4

A

CCESSORIES

 ............................................................................................................................................................................................. 6

PREPARING FOR INSTALLATION .................................................................................................................................................... 7

R

EQUIRED 

P

RE

-P

ROVISIONING 

E

QUIPMENT

 ..................................................................................................................................................... 7

R

EQUIRED 

O

UTDOOR 

E

QUIPMENT

 ................................................................................................................................................................. 7

I

NSTALLATION 

L

OCATION

 .............................................................................................................................................................................. 7

P

RE

-P

ROVISIONING

 ..................................................................................................................................................................................... 8

INSTALLING THE GATEWAY .......................................................................................................................................................... 10

U

TILITY 

P

OLE 

I

NSTALLATION

 ....................................................................................................................................................................... 11

Mounting the Device ....................................................................................................................................................................... 11
Grounding and Protecting the Device ............................................................................................................................................. 12
Connecting the Device to a Source of Power ................................................................................................................................... 13
Completing the installation ............................................................................................................................................................. 14

S

TREETLIGHT 

P

OLE 

M

OUNTING AND 

G

ROUNDING

 ........................................................................................................................................... 15

Mounting the Device ....................................................................................................................................................................... 15
Connecting the Device to a Source of Power ................................................................................................................................... 17
Completing the Installation ............................................................................................................................................................. 18

O

PTIONAL 

W

I

-F

A

NTENNA 

I

NSTALLATION

 .................................................................................................................................................... 19

Attaching the Optional Wi-Fi Antennas........................................................................................................................................... 19

COMMISSIONING THE GATEWAY ................................................................................................................................................. 20

C

ONFIGURING THE 

S

ECURE

M

ESH 

G

ATEWAY

 .................................................................................................................................................. 20

M

ONITORING THE 

P

OWER

-O

S

EQUENCE

 ..................................................................................................................................................... 20

APPENDIX .................................................................................................................................................................................... 21

G

ROUNDING 

G

UIDELINES

 ........................................................................................................................................................................... 21

FCC

 

S

TATEMENT 

(US)............................................................................................................................................................................... 23

I

NDUSTRY 

C

ANADA 

/

 

I

NDUSTRIE 

C

ANADA 

(C

ANADA

) ....................................................................................................................................... 23

 

 

 

Содержание SecureMesh GATE-1000

Страница 1: ...Mounting the Device 11 Grounding and Protecting the Device 12 Connecting the Device to a Source of Power 13 Completing the installation 14 STREETLIGHT POLE MOUNTING AND GROUNDING 15 Mounting the Devic...

Страница 2: ...power distribution equipment Is trained in the care and use of protective equipment such as flash clothing safety glasses face shield hardhat rubber gloves hotstick etc The following is important saf...

Страница 3: ...verall air data rate up to 54 Mbps and information throughput of 15 20 Mbps where this capacity is dynamically shared or explicitly allocated to support the network s intended applications such as AMI...

Страница 4: ...Components The following diagram shows the major components of the SecureMesh Gateway side view Ethernet 8P8C data and power serial 8P8C water intrusion gasket status lights optional Wi Fi access poi...

Страница 5: ...illiant Incorporated page 5 of 23 The following diagram shows the SecureMesh Gateway package contents SecureMesh Gateway Wi Fi antennas if ordered with this option Indoor Power Supply w PoE Injector P...

Страница 6: ...pply Indoor Power Supply w PoE Injector 170 R0006 01 optional indoor power supply 100 240 VAC 24 VDC 1 3A power cord sold separately see below Streetlight Power Supply optional outdoor power supply no...

Страница 7: ...oE power supply is the PSU 1024 33 24V Power Service Unit any type of Ethernet cable can be used otherwise a cross over cable must be used A surge suppressor either the unit identified on the accessor...

Страница 8: ...quate space must be available to use a bucket truck The installation location must not impede normal maintenance activities for example access to the Gateway s associated Power Service Unit to replace...

Страница 9: ...to be established to the VPN router note that in automatic provisioning mode node configuration is provided in a secure manner over the IPsec VPN tunnel requiring the VPN credentials in order to estab...

Страница 10: ...y installing the SecureMesh Gateway involves Mounting the device Grounding and protecting the device Connecting to a source of power Completing the installation Optionally Attaching the Wi Fi antennas...

Страница 11: ...mounting pole through the end of the extension arm using the 5 8 attached bolt on the bottom of the pole mount Firmly tighten Attach The Gateway to the Bracket Use the provided mounting bracket and ap...

Страница 12: ...rotector and the hole in the surge protector bracket Before tightening the ground screw remove a section of the insulation on the ground wire which will attach to the ground point on the mounting stru...

Страница 13: ...to be passed through The cable will have to be re terminated Therefore it may be best to perform the termination on the ground before beginning the installation A sufficient portion of the cable shie...

Страница 14: ...g are proper and replace the surge protector s cover and the Ethernet connection cover on the base of the Gateway These screws should be tightened to 15 foot pounds 20 Newton meters of torque Secure t...

Страница 15: ...the nuts from the bolts and separate the clamp from the main bracket Place the main bracket over the light pole s horizontal extension arm Place the clamp on the bolts and secure with the nuts provid...

Страница 16: ...the 8P8C into the socket on the bottom of the Gateway until it locks into place as shown on the right The Ethernet PoE cable should be routed through the water protection gasket Loosen the ground scre...

Страница 17: ...rovides surge protection Connect to Streetlight AC Power Locate the photocell on the light pole usually located on top of the street lamp and remove it twisting it counter clockwise and lifting it fro...

Страница 18: ...nding are proper and replace the surge protection box cover and the Ethernet cover to the base of the Gateway These screws should be tightened to 15 foot pounds 20 Newton meters of torque Secure the C...

Страница 19: ...h 2 4 GHz Wi Fi antenna to the N type female connectors as shown in to the right Hand tighten or equivalently tighten the antennas using a torque limiting tool tighten it to 14 inch pounds 1 5 Newton...

Страница 20: ...that follow provide detailed descriptions of device states indicated by the LED lights When both LED lights are illuminated and steady the Gateway has successfully connected to the wireless network De...

Страница 21: ...ransient protection specialist General Grounding Strategy To ensure optimal reliability properly ground the metal base of the SecureMesh device The most efficient way to ground the device is to use a...

Страница 22: ...building When using outdoor Ethernet cable use UV protected Shielded Twisted Pair STP CAT5e cabling that includes a drain wire The drain wire and cable shield should be connected to the appropriate g...

Страница 23: ...to operate the equipment under FCC rules Industry Canada Industrie Canada Canada This device complies with ICES 003 and RSS 210 of Industry Canada Operation is subject to the following two conditions...

Отзывы: